Twin Yards Solar Farm (5 MW)

Twin Yards Solar Farm is a 5 MW solar farm project in Bolsover, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 20 March 2017; the record was last updated on 31 October 2017.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

5 MWsolar farm
operationalstatus in REPD
31 October 2017record last updated
Bolsovercouncil area

Planning timeline

DateStage
9 July 2015Application submitted
25 September 2015Planning permission granted
20 January 2017Construction started
20 March 2017Operational

Project details

Technology
solar farm
Capacity
5 MW
Status (REPD)
operational
Record last updated
31 October 2017
Operator or applicant
Global Renewable Construction
Planning authority
Bolsover
Planning application reference
15/00327/FUL
Address (REPD)
Land To The South East Of, The Hideaway, Pasture Lane, Hilcote, Alfreton, Derbyshire
Council area (by location)
Bolsover
Time to decision
11 weeks
REPD reference
5415

Who decides

ApplicationsBolsoverUK
Decided applications (solar, wind, battery)2010,236
Refused4 (20%)19%
Solar refused2 of 1212%
Onshore wind refused2 of 245%
Battery storage refused0 of 616%
Median time from submission to decision12.5 weeks17.0 weeks
Appeals lodged / allowed1 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Fulwood Grange Farmsolar farm5abandoned2.0
Newton Wood Farmbattery storage49.9approved, not built2.3
Hurst Farm, Mansfield Roadbattery storage99.9approved, not built3.1
Former Langton Colliery Sitesolar farm5.7permission expired3.3
Meadow Lane Solar Farmsolar farm19.6under construction3.8
Eden Meadows, Stretton Road, Morton Solar PV Panels & Battery Energy Storage Systemsolar farm49.9refused5.3
Hall Farm Solar Farmsolar farm50refused5.3
Alfreton Solar Farmsolar farm25application withdrawn5.4
Padleywood Farmsolar farm5operational5.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.1188, -1.3214).