Aston Grange, Aston Solar Panels & Battery Energy Storage System (20 MW)

Aston Grange, Aston Solar Panels & Battery Energy Storage System is a 20 MW solar farm project in Cheshire West and Chester, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 24 February 2025, no decision recorded; the record was last updated on 24 March 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

20 MWsolar farm
application submittedstatus in REPD
24 March 2025record last updated
Cheshire West and Chestercouncil area

Planning timeline

DateStage
24 February 2025Application submitted

Project details

Technology
solar farm
Capacity
20 MW
Status (REPD)
application submitted
Record last updated
24 March 2025
Operator or applicant
Innova Renewables
Planning authority
Cheshire West and Chester
Planning application reference
25/00100/FULEIA
Site area
55.2 ha
Address (REPD)
Aston Grange, Aston, Runcorn
Council area (by location)
Cheshire West and Chester
Name in REPD
Aston Grange, Aston - Solar Panels & Battery Energy Storage System
REPD reference
18374

The scheme also includes 6 MW of battery storage, recorded separately in REPD (application submitted).

Who decides

ApplicationsCheshire West and ChesterUK
Decided applications (solar, wind, battery)5410,236
Refused6 (11%)19%
Solar refused3 of 4012%
Onshore wind refused1 of 245%
Battery storage refused2 of 1216%
Median time from submission to decision10.1 weeks17.0 weeks
Appeals lodged / allowed1 / 2—

Other large projects within 10 km

ProjectTypeMWStatuskm
Aston Grange Farmwind farm12refused on appeal0.5
Cholmondeley Roadbattery storage150approved, not built4.6
Frodsham Solar Project & Battery Storagesolar farm147application submitted5.6
Frodsham Marshwind farm50.4operational7.8
Wallerscote Limebeds Solar Pv Parksolar farm22approved, not built8.5
Wallerscote Limebedsbattery storage30approved, not built8.5
Station Road, Fiddlers Ferrybattery storage250refused8.7
Fiddlers Ferry Power Stationbattery storage150under construction9.0
Land south of 50 Station Roadsolar farm5refused9.4

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.2953, -2.6523).