Bagletts Wind Farm (6.9 MW)
Bagletts Wind Farm is a 6.9 MW wind farm project in East Riding of Yorkshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 15 July 2015; the record was last updated on 5 August 2015.
6.9 MWwind farm
application withdrawnstatus in REPD
5 August 2015record last updated
East Riding of Yorkshirecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 8 December 2014 | Application submitted |
| 15 July 2015 | Application withdrawn |
Project details
- Technology
- wind farm
- Capacity
- 6.9 MW
- Status (REPD)
- application withdrawn
- Record last updated
- 5 August 2015
- Operator or applicant
- Lantanier UK
- Planning authority
- East Riding of Yorkshire
- Planning application reference
- 14/03106/STPLFE
- Turbines
- 3
- Turbine height
- 121 m
- Address (REPD)
- Land off Ings Lane, Ellerker, East Yorkshire
- Council area (by location)
- East Riding of Yorkshire
- REPD reference
- 4905
Who decides
| Applications | East Riding of Yorkshire | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 143 | 10,236 |
| Refused | 26 (18%) | 19% |
| Solar refused | 1 of 59 | 12% |
| Onshore wind refused | 24 of 63 | 45% |
| Battery storage refused | 1 of 21 | 16% |
| Median time from submission to decision | 18.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 4 / 10 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Melton Common Wind Cluster | wind farm | 5 | operational | 6.9 |
| Melton Waste Park | wind farm | 5 | operational | 7.0 |
| Winterton Landfill Site - Ground Mounted Solar PV Arrays | solar farm | 5 | under construction | 8.1 |
| Ironstone Quarry Wind Farm | wind farm | 7.5 | refused | 9.3 |
| Sober Hill Wind Farm | wind farm | 15 | operational | 9.8 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.7488, -0.6261).