Energy Projects Near You

Barfield Lane, Reepham (53 MW battery storage)

Barfield Lane, Reepham is a 53 MW battery storage project in West Lindsey, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 1 September 2023, no decision recorded; the record was last updated on 27 September 2023. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

53 MWbattery storage
application submittedmay be out of datestatus in REPD
27 September 2023record last updated
West Lindseycouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
1 September 2023Application submitted

Project details

Technology
battery storage (stand-alone storage)
Capacity
53 MW
Status (REPD)
application submitted
Record last updated
27 September 2023
Operator or applicant
Fiskerton Bess Limited
Planning authority
West Lindsey
Planning application reference
147131
Address (REPD)
S/O Barfield Lane, Reepham, Lincoln
Council area (by location)
West Lindsey
Name in REPD
Barfield Lane, Reepham - Battery Energy Storage System
REPD reference
12600

Who decides

ApplicationsWest LindseyUK
Decided applications (solar, wind, battery)2610,236
Refused7 (27%)19%
Solar refused3 of 2112%
Onshore wind refused3 of 345%
Battery storage refused1 of 216%
Median time from submission to decision11.0 weeks17.0 weeks
Appeals lodged / allowed3 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Fiskerton Airfield (Phase 1)solar farm12operational1.3
Fiskerton Airfield (Phase 2)solar farm22operational1.3
The Old Airfield Solar Photovoltaic Farmsolar farm49.9approved, not built1.4
Springwell Solar Farm & Battery Storagesolar farm800approved, not built5.0
Stainton Oil Production Facilitywind farm28application withdrawn5.4
Middle Streetsolar farm20refused on appeal7.1
Branston Solar Park (extension)solar farm40under construction7.5
Branston solar parksolar farm18.9operational7.9
Leverton Farm Energy Barnbattery storage10operational7.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.2501, -0.4458).