The Old Airfield Solar Photovoltaic Farm (49.9 MW)

The Old Airfield Solar Photovoltaic Farm is a 49.9 MW solar farm project in West Lindsey, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 27 May 2021, not yet built; the record was last updated on 8 October 2024. REPD records the planning permission as expiring on 27 May 2024, but the project holds a Contracts for Difference award (AR6), so construction may have started. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

49.9 MWsolar farm
approved, not builtmay be out of datestatus in REPD
8 October 2024record last updated
West Lindseycouncil area

REPD records the planning permission as expiring on 27 May 2024, but the project holds a Contracts for Difference award (AR6), so construction may have started.

Planning timeline

DateStage
7 December 2020Application submitted
27 May 2021Planning permission granted
27 May 2024Permission expired

Project details

Technology
solar farm
Capacity
49.9 MW
Status (REPD)
approved, not built
Record last updated
8 October 2024
Operator or applicant
Grey Street Solar Limited
Planning authority
West Lindsey
Planning application reference
142117
Site area
84.0 ha
Address (REPD)
The Old Airfield, Reepham Road, Fiskerton, Lincoln
Council area (by location)
West Lindsey
Time to decision
24 weeks
Contracts for Difference
AR6
REPD reference
9575

Who decides

ApplicationsWest LindseyUK
Decided applications (solar, wind, battery)2610,236
Refused7 (27%)19%
Solar refused3 of 2112%
Onshore wind refused3 of 345%
Battery storage refused1 of 216%
Median time from submission to decision11.0 weeks17.0 weeks
Appeals lodged / allowed3 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Fiskerton Airfield (Phase 1)solar farm12operational0.8
Fiskerton Airfield (Phase 2)solar farm22operational0.8
Barfield Lane, Reephambattery storage53application submitted1.4
Springwell Solar Farm & Battery Storagesolar farm800approved, not built5.5
Branston Solar Park (extension)solar farm40under construction6.4
Stainton Oil Production Facilitywind farm28application withdrawn6.5
Branston solar parksolar farm18.9operational6.8
Middle Streetsolar farm20refused on appeal8.1
Leverton Farm Energy Barnbattery storage10operational8.8

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.2387, -0.4371).