Barleylands Solar Farm (17 MW)

Barleylands Solar Farm is a 17 MW solar farm project in Basildon, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 8 October 2024, not yet built; the record was last updated on 28 October 2024.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

17 MWsolar farm
approved, not builtstatus in REPD
28 October 2024record last updated
Basildoncouncil area

Planning timeline

DateStage
29 November 2023Application submitted
8 October 2024Planning permission granted

Project details

Technology
solar farm
Capacity
17 MW
Status (REPD)
approved, not built
Record last updated
28 October 2024
Operator or applicant
Enso Energy Limited
Planning authority
Basildon
Planning application reference
23/01468/FULL
Site area
119.6 ha
Address (REPD)
Barleylands Barleylands Road Billericay
Council area (by location)
Basildon
Time to decision
45 weeks
REPD reference
15461

The scheme also includes battery storage, recorded separately in REPD (approved, not built).

Earlier applications for this site

ApplicationMWSubmittedOutcome
Barleylands Solar Farm 22/00411/FULL—5 April 2022replaced by a revised application

Who decides

ApplicationsBasildonUK
Decided applications (solar, wind, battery)2010,236
Refused2 (10%)19%
Solar refused1 of 1212%
Battery storage refused1 of 816%
Median time from submission to decision16.8 weeks17.0 weeks
Appeals lodged / allowed1 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Whites Farmbattery storage49.9refused0.7
Crays Hall Farm Solar Arrayssolar farm25.6operational1.8
Outwood Farm (Phase 1)solar farm5operational2.3
Outwood Farm (Phase 2)solar farm7approved, not built2.3
Nevendonbattery storage10operational3.5
Nevendon Battery Storage Extensionbattery storage5operational3.5
Ford Research And Engineering Centre, Dunton Solar Farmsolar farm5.2operational3.5
Great Cowbridge Grange Farm, London Road Solar Farmsolar farm10approved, not built4.7
Crouch Solar Farmsolar farm49.9operational4.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.6012, 0.4454).