Bradford West, Harrop Lane, Wilsden (100 MW battery storage)

Bradford West, Harrop Lane, Wilsden is a 100 MW battery storage project in Bradford, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 15 May 2023, not yet built; the record was last updated on 25 May 2023. REPD also records that the planning permission expired on 15 May 2026, so the project may not go ahead in this form. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

100 MWbattery storage
approved, not builtmay be out of datestatus in REPD
25 May 2023record last updated
Bradfordcouncil area

REPD also records that the planning permission expired on 15 May 2026, so the project may not go ahead in this form.

Planning timeline

DateStage
8 December 2022Application submitted
15 May 2023Planning permission granted
15 May 2026Permission expired

Project details

Technology
battery storage (stand-alone storage)
Capacity
100 MW
Status (REPD)
approved, not built
Record last updated
25 May 2023
Operator or applicant
24 Power Limited
Planning authority
Bradford
Planning application reference
22/05010/MAF
Address (REPD)
Harrop Lane, Wilsden, Bradford
Council area (by location)
Bradford
Time to decision
23 weeks
Name in REPD
Bradford West, Harrop Lane, Wilsden - Battery Storage
REPD reference
12909

Who decides

ApplicationsBradfordUK
Decided applications (solar, wind, battery)3710,236
Refused2 (5%)19%
Solar refused0 of 2612%
Onshore wind refused1 of 145%
Battery storage refused1 of 1016%
Median time from submission to decision8.0 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Bradford West Substation (Harrop Edge Farm)battery storage49.9under construction0.1
Peat Dykes Farm, Harrop Lanebattery storage100approved, not built0.5
Old Allen Road, Wilsdenbattery storage99.9application submitted0.6
Lane Sidebattery storage100approved, not built0.8
Stor Generation Plantbattery storage12approved, not built4.9
Holmfield Battery Storagebattery storage500approved, not built5.8
Ovenden Moor (Repower)wind farm18operational5.9
Ovenden Moorwind farm9.2decommissioned6.4
Midland Roadbattery storage80approved, not built6.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.8107, -1.8608).