Old Allen Road, Wilsden (99.9 MW battery storage)

Old Allen Road, Wilsden is a 99.9 MW battery storage project in Bradford, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 2 October 2025, no decision recorded; the record was last updated on 20 November 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

99.9 MWbattery storage
application submittedstatus in REPD
20 November 2025record last updated
Bradfordcouncil area

Planning timeline

DateStage
2 October 2025Application submitted

Project details

Technology
battery storage (stand-alone storage)
Capacity
99.9 MW
Status (REPD)
application submitted
Record last updated
20 November 2025
Operator or applicant
Renewable Connections Developments Limited
Planning authority
Bradford
Planning application reference
25/03275/MAF
Address (REPD)
Old Allen Road, Wilsden, Bradford
Council area (by location)
Bradford
Name in REPD
Old Allen Road, Wilsden - Battery Energy Storage System
REPD reference
18266

Who decides

ApplicationsBradfordUK
Decided applications (solar, wind, battery)3710,236
Refused2 (5%)19%
Solar refused0 of 2612%
Onshore wind refused1 of 145%
Battery storage refused1 of 1016%
Median time from submission to decision8.0 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Peat Dykes Farm, Harrop Lanebattery storage100approved, not built0.2
Bradford West Substation (Harrop Edge Farm)battery storage49.9under construction0.5
Bradford West, Harrop Lane, Wilsdenbattery storage100approved, not built0.6
Lane Sidebattery storage100approved, not built1.2
Stor Generation Plantbattery storage12approved, not built5.1
Holmfield Battery Storagebattery storage500approved, not built5.3
Ovenden Moor (Repower)wind farm18operational5.4
Ovenden Moorwind farm9.2decommissioned5.9
Swales Moor Farmbattery storage5permission expired6.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.8066, -1.8661).