Bretton Hall Solar Farm (Wales) (16 MW)

Bretton Hall Solar Farm (Wales) is a 16 MW solar farm project in Flintshire, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 19 December 2023, not yet built; the record was last updated on 10 January 2024. It is decided by the Welsh Government as a development of national significance.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

16 MWsolar farm
approved, not builtstatus in REPD
10 January 2024record last updated
Flintshirecouncil area

Planning timeline

DateStage
8 July 2022Application submitted
19 December 2023Planning permission granted

Project details

Technology
solar farm
Capacity
16 MW
Status (REPD)
approved, not built
Record last updated
10 January 2024
Operator or applicant
YnNi Newydd (New Energy Co-op)
Planning authority
Welsh Government (NSIP)
Planning application reference
DNS/3251545
Site area
25.0 ha
Address (REPD)
Bretton Hall Farm, Chester Road, Flintshire,
Council area (by location)
Flintshire
Time to decision
76 weeks
REPD reference
7860

The scheme also includes battery storage, recorded separately in REPD (approved, not built).

Who decides

It is decided by the Welsh Government as a development of national significance. Welsh Government (NSIP) refused 22% of 55 decided solar, wind and battery applications in REPD (median 67 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Bretton Hall Solar Farm (England)solar farm14approved, not built0.5
Wood Farm Solar Park (linked site)solar farm5refused on appeal3.2
Banks Farm Solar Park (linked site)solar farm5refused on appeal3.8
Huntington Water Treatment Workssolar farm7.2operational6.0
Mollingtonbattery storage240approved, not built8.1
Land West Of Vicarage Lanesolar farm5application submitted8.2
Portmanmoor Road Industrial Estate, Splott Battery Storage Unitsbattery storage10approved, not built8.2
Electricity Substation, Bellevue Lanebattery storage40approved, not built8.2
Shotwick Solar Farmsolar farm72.2operational8.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.1713, -2.9557).