Cairn Uish Wind Farm Extension (21 MW)

Cairn Uish Wind Farm Extension is a 21 MW wind farm project in Moray, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 11 August 2004; the record was last updated on 11 August 2004.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

21 MWwind farm
application withdrawnstatus in REPD
11 August 2004record last updated
Moraycouncil area

Planning timeline

DateStage
11 August 2004Application withdrawn

Project details

Technology
wind farm
Capacity
21 MW
Status (REPD)
application withdrawn
Record last updated
11 August 2004
Operator or applicant
Natural Power Consultants
Planning authority
Moray
Planning application reference
IEC3/98
Address (REPD)
Cairn Uish, 10km south of Elgin, Moray
Council area (by location)
Moray
REPD reference
3535

Who decides

ApplicationsMorayUK
Decided applications (solar, wind, battery)2110,236
Refused7 (33%)19%
Solar refused0 of 212%
Onshore wind refused7 of 1445%
Battery storage refused0 of 516%
Median time from submission to decision60.9 weeks17.0 weeks
Appeals lodged / allowed4 / 6—

Other large projects within 10 km

ProjectTypeMWStatuskm
Rothes Wind Farm (Extension) (II)wind farm41.4operational<0.1
Rothes Wind (Cairn Uish)wind farm50.6operational<0.1
Kellas Wind Farmwind farm38.4approved, not built2.6
Kellas Wind Farmbattery storage30approved, not built2.6
Meikle Hill wind farmwind farm13.8permission expired3.4
Rothes Wind Farm IIIwind farm132approved, not built3.5
Kellas Wind Farmwind farm18.4permission expired3.9
Teindland Wind Farmwind farm85application submitted9.4
Brown Muir Wind Farm (resubmission)wind farm36refused on appeal9.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (57.5373, -3.363).