Rothes Wind Farm (Extension) (II) (41.4 MW)

Rothes Wind Farm (Extension) (II) is a 41.4 MW wind farm project in Moray, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 15 April 2013; the record was last updated on 30 August 2013.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

41.4 MWwind farm
operationalstatus in REPD
30 August 2013record last updated
Moraycouncil area

Planning timeline

DateStage
10 December 2007Application submitted
12 January 2010Planning permission granted
1 April 2012Construction started
15 April 2013Operational

Project details

Technology
wind farm
Capacity
41.4 MW
Status (REPD)
operational
Record last updated
30 August 2013
Operator or applicant
Fred Olsen Renewables
Planning authority
Moray
Planning application reference
not recorded
Turbines
18
Address (REPD)
Rothes Windfarm, at Cairn Uish near Elgin
Council area (by location)
Moray
Time to decision
109 weeks
REPD reference
3951

Who decides

ApplicationsMorayUK
Decided applications (solar, wind, battery)2110,236
Refused7 (33%)19%
Solar refused0 of 212%
Onshore wind refused7 of 1445%
Battery storage refused0 of 516%
Median time from submission to decision60.9 weeks17.0 weeks
Appeals lodged / allowed4 / 6—

Other large projects within 10 km

ProjectTypeMWStatuskm
Rothes Wind (Cairn Uish)wind farm50.6operational<0.1
Cairn Uish Wind Farm Extensionwind farm21application withdrawn<0.1
Kellas Wind Farmwind farm38.4approved, not built2.6
Kellas Wind Farmbattery storage30approved, not built2.6
Meikle Hill wind farmwind farm13.8permission expired3.4
Rothes Wind Farm IIIwind farm132approved, not built3.5
Kellas Wind Farmwind farm18.4permission expired3.9
Teindland Wind Farmwind farm85application submitted9.4
Brown Muir Wind Farm (resubmission)wind farm36refused on appeal9.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (57.5373, -3.363).