Church Farm, Withington Solar Farm (25 MW)

Church Farm, Withington Solar Farm is a 25 MW solar farm project in Shropshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 13 April 2023, not yet built; the record was last updated on 28 April 2023. REPD records the planning permission as expiring on 13 April 2026, but the project holds a Contracts for Difference award (AR5), so construction may have started. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

25 MWsolar farm
approved, not builtmay be out of datestatus in REPD
28 April 2023record last updated
Shropshirecouncil area

REPD records the planning permission as expiring on 13 April 2026, but the project holds a Contracts for Difference award (AR5), so construction may have started.

Planning timeline

DateStage
26 August 2022Application submitted
13 April 2023Planning permission granted
13 April 2026Permission expired

Project details

Technology
solar farm
Capacity
25 MW
Status (REPD)
approved, not built
Record last updated
28 April 2023
Operator or applicant
Elgin Energy
Planning authority
Shropshire
Planning application reference
22/03486/FUL
Site area
47.6 ha
Address (REPD)
The South Of Withington
Council area (by location)
Shropshire
Time to decision
33 weeks
Contracts for Difference
AR5
Name in REPD
Church Farm, Withington - Solar Farm
REPD reference
12005

Who decides

ApplicationsShropshireUK
Decided applications (solar, wind, battery)9810,236
Refused22 (22%)19%
Solar refused20 of 7812%
Onshore wind refused2 of 345%
Battery storage refused0 of 1716%
Median time from submission to decision15.2 weeks17.0 weeks
Appeals lodged / allowed10 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
Pelham Road, Upton Magnabattery storage100application submitted2.8
Tiddiecross Solar Farmsolar farm10.5operational3.6
Tiddiecross Solar Farm & Battery Storagesolar farm14approved, not built3.6
Battery Energy Storagebattery storage100application submitted4.4
Haughmond Quarry - Uffington Solar Farmsolar farm25refused4.5
Bridge Farm, Uffingtonbattery storage8approved, not built4.5
Myttons Solar Farmsolar farm49.9approved, not built4.5
Rushmoor Lane Farm (Cheshire Coppice)solar farm5operational5.2
Sundorne Grovesolar farm20operational6.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.7124, -2.6265).