Energy Projects Near You

Battery Energy Storage (100 MW)

Battery Energy Storage is a 100 MW battery storage project in Shropshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 24 February 2025, no decision recorded; the record was last updated on 24 March 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

100 MWbattery storage
application submittedstatus in REPD
24 March 2025record last updated
Shropshirecouncil area

Planning timeline

DateStage
24 February 2025Application submitted

Project details

Technology
battery storage (stand-alone storage)
Capacity
100 MW
Status (REPD)
application submitted
Record last updated
24 March 2025
Operator or applicant
Lower 48 Energy BESS Limited
Planning authority
Shropshire
Planning application reference
25/00531/FUL
Address (REPD)
SW/O Shrewsbury Substation, Uffington, Shrewsbury
Council area (by location)
Shropshire
Name in REPD
Battery Shrewsbury Substation, Uffington - Battery Energy Storage
REPD reference
18366

Who decides

ApplicationsShropshireUK
Decided applications (solar, wind, battery)9810,236
Refused22 (22%)19%
Solar refused20 of 7812%
Onshore wind refused2 of 345%
Battery storage refused0 of 1716%
Median time from submission to decision15.2 weeks17.0 weeks
Appeals lodged / allowed10 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
Bridge Farm, Uffingtonbattery storage8approved, not built0.6
Pelham Road, Upton Magnabattery storage100application submitted2.2
Haughmond Quarry - Uffington Solar Farmsolar farm25refused2.2
Sundorne Grovesolar farm20operational3.2
Church Farm, Withington Solar Farmsolar farm25approved, not built4.4
Myttons Solar Farmsolar farm49.9approved, not built5.3
Berrington Farmsolar farm30approved, not built6.1
Condover (Green Farm)solar farm10.2operational6.2
Tiddiecross Solar Farmsolar farm10.5operational7.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.708, -2.6919).