Clough Road Battery Energy System (130 MW)
Clough Road Battery Energy System is a 130 MW battery storage project in Kingston upon Hull, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 12 September 2023, not yet built; the record was last updated on 20 September 2023.
130 MWbattery storage
approved, not builtstatus in REPD
20 September 2023record last updated
Kingston upon Hullcouncil area
Planning timeline
| Date | Stage |
|---|---|
| 13 June 2023 | Application submitted |
| 12 September 2023 | Planning permission granted |
| 12 September 2026 | Permission expired |
Project details
- Technology
- battery storage (stand-alone storage)
- Capacity
- 130 MW
- Status (REPD)
- approved, not built
- Record last updated
- 20 September 2023
- Operator or applicant
- GAM Capital Limited
- Planning authority
- Kingston upon Hull, City of
- Planning application reference
- 23/02771/FULL
- Address (REPD)
- S/O Clough Road, Kingston Upon Hull
- Council area (by location)
- Kingston upon Hull
- Time to decision
- 13 weeks
- Name in REPD
- Clough Road - Battery Energy System
- REPD reference
- 14225
Who decides
| Applications | Kingston upon Hull | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 29 | 10,236 |
| Refused | 0 (0%) | 19% |
| Solar refused | 0 of 25 | 12% |
| Onshore wind refused | 0 of 1 | 45% |
| Battery storage refused | 0 of 3 | 16% |
| Median time from submission to decision | 10.0 weeks | 17.0 weeks |
| Appeals lodged / allowed | 0 / 0 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Croxby Hall Farm, Inglemire Lane Solar Farm & Battery Storage | solar farm | 9.7 | application withdrawn | 3.3 |
| Snuff Mill Lane Gates Solar Farm & Battery Storage | solar farm | 9.7 | application withdrawn | 4.2 |
| Bransholme, Hull | battery storage | 18 | abandoned | 4.3 |
| Carlam Hill Education CIC | solar farm | 5 | operational | 4.9 |
| Creyke Beck Substation Solar Farm & Battery Storage | solar farm | 49.9 | approved, not built | 5.4 |
| Kenley House Farm, Ferry Road Solar Farm | solar farm | 49.9 | application submitted | 6.0 |
| Hull East Stor Generation Compound | battery storage | 20 | approved, not built | 6.0 |
| Green Frog Power, Great Field Lane | battery storage | 20 | approved, not built | 6.2 |
| Pillswood Phase 1 | battery storage | 49.5 | operational | 6.2 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.7672, -0.3397).