Cornharrow Wind Farm (38.4 MW)

Cornharrow Wind Farm is a 38.4 MW wind farm project in Dumfries and Galloway, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 21 March 2022, not yet built; the record was last updated on 11 January 2022. REPD also records that the planning permission expired on 21 March 2025, so the project may not go ahead in this form. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

38.4 MWwind farm
approved, not builtmay be out of datestatus in REPD
11 January 2022record last updated
Dumfries and Gallowaycouncil area

REPD also records that the planning permission expired on 21 March 2025, so the project may not go ahead in this form.

Planning timeline

DateStage
19 February 2020Application submitted
21 August 2020Refused by the planning authority
21 August 2020Appeal lodged
21 March 2022Planning permission granted
21 March 2022Appeal allowed
21 March 2025Permission expired

Project details

Technology
wind farm
Capacity
38.4 MW
Status (REPD)
approved, not built
Record last updated
11 January 2022
Operator or applicant
EnergieKontor UK
Planning authority
Dumfries and Galloway
Planning application reference
20/0159/FUL
Appeal reference
PPA-170-2145
Turbines
8
Turbine height
150 m
Address (REPD)
Cornharrow Wind Farm, Land At Cornharrow, Dalry, Castle Douglas
Council area (by location)
Dumfries and Galloway
Time to decision
109 weeks
REPD reference
7654

Recorded together with Cornharrow Wind Farm Battery (battery storage, approved, not built).

Who decides

ApplicationsDumfries and GallowayUK
Decided applications (solar, wind, battery)10610,236
Refused40 (38%)19%
Solar refused1 of 1812%
Onshore wind refused33 of 7245%
Battery storage refused6 of 1616%
Median time from submission to decision60.9 weeks17.0 weeks
Appeals lodged / allowed19 / 17—

Other large projects within 10 km

ProjectTypeMWStatuskm
Longburn Wind Farmwind farm72application withdrawn3.0
Troston Lochwind farm67.2approved, not built3.3
Troston Loch Wind Farmbattery storage20approved, not built3.3
Wether Hillwind farm18.2operational3.5
Wether Hill WindFarm (extension)wind farm22application withdrawn3.9
Shepherd's Rig Wind Farmwind farm81approved, not built4.4
Glenshimmeroch Wind Farmwind farm36approved, not built5.2
Margree Windfarmwind farm49.9approved, not built6.4
Lorg Windfarmwind farm64approved, not built7.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.212, -4.0965).