Energy Projects Near You

Longburn Wind Farm (72 MW)

Longburn Wind Farm is a 72 MW wind farm project in Dumfries and Galloway, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 5 November 2015; the record was last updated on 1 November 2016. As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

72 MWwind farm
application withdrawnstatus in REPD
1 November 2016record last updated
Dumfries and Gallowaycouncil area

Planning timeline

DateStage
28 June 2013Application submitted
5 November 2015Application withdrawn

Project details

Technology
wind farm
Capacity
72 MW
Status (REPD)
application withdrawn
Record last updated
1 November 2016
Operator or applicant
Burcote Wind
Planning authority
Scottish Government (S36)
Planning application reference
EC00002080
Turbines
20
Address (REPD)
Carsphairn in Dumfries and Galloway
Council area (by location)
Dumfries and Galloway
REPD reference
4230

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. Scottish Government (S36) refused 18% of 334 decided solar, wind and battery applications in REPD (median 127 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Wether Hillwind farm18.2operational0.8
Wether Hill WindFarm (extension)wind farm22application withdrawn1.0
Cornharrow Wind Farmwind farm38.4approved, not built3.0
Troston Loch Wind Farmbattery storage20approved, not built3.4
Troston Lochwind farm67.2approved, not built3.4
Glenshimmeroch Wind Farmwind farm36approved, not built6.6
Lorg Windfarmwind farm64approved, not built7.0
Margree Windfarmwind farm49.9approved, not built7.1
Shepherd's Rig Wind Farmwind farm81approved, not built7.4

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.2166, -4.0496).