Cullion wind farm (25 MW)

Cullion wind farm is a 25 MW wind farm project in Mid Ulster, Northern Ireland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 19 July 2019, no decision recorded; the record was last updated on 27 September 2019. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

25 MWwind farm
application submittedmay be out of datestatus in REPD
27 September 2019record last updated
Mid Ulstercouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
19 July 2019Application submitted

Project details

Technology
wind farm
Capacity
25 MW
Status (REPD)
application submitted
Record last updated
27 September 2019
Operator or applicant
ABO Wind
Planning authority
Mid Ulster
Planning application reference
LA09/2019/0990/F
Turbines
6
Turbine height
145 m
Address (REPD)
29 Cullion Road, Desertmartin, Magherafelt, Co Londonderry
Council area (by location)
Mid Ulster
REPD reference
7530

Who decides

ApplicationsMid UlsterUK
Decided applications (solar, wind, battery)4910,236
Refused8 (16%)19%
Solar refused0 of 912%
Onshore wind refused8 of 3345%
Battery storage refused0 of 716%
Median time from submission to decision68.9 weeks17.0 weeks
Appeals lodged / allowed5 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Crockandunwind farm15operational3.2
Draperstown (Brackagh) Wind Farmwind farm6operational6.1
Ballynagilly Renewable Energy Projectwind farm18.4appeal withdrawn8.8

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.7588, -6.7357).