Easter Drumclair Wood (6 MW wind farm)

Easter Drumclair Wood is a 6 MW wind farm project in Falkirk, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 8 April 2022, not yet built; the record was last updated on 19 April 2022. REPD records the planning permission as expiring on 8 April 2025, but the project holds a Contracts for Difference award (AR6), so construction may have started. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6 MWwind farm
approved, not builtmay be out of datestatus in REPD
19 April 2022record last updated
Falkirkcouncil area

REPD records the planning permission as expiring on 8 April 2025, but the project holds a Contracts for Difference award (AR6), so construction may have started.

Planning timeline

DateStage
24 February 2022Application submitted
8 April 2022Planning permission granted
8 April 2025Permission expired

Project details

Technology
wind farm
Capacity
6 MW
Status (REPD)
approved, not built
Record last updated
19 April 2022
Operator or applicant
Tamani
Planning authority
Falkirk
Planning application reference
P/22/0086/FUL
Turbines
2
Turbine height
150 m
Address (REPD)
Land to North OfLochview House, Slamannan,
Council area (by location)
Falkirk
Time to decision
6 weeks
Contracts for Difference
AR6
REPD reference
11032

Earlier applications for this site

ApplicationMWSubmittedOutcome
Easter Drumclair Wood P/19/0023/FUL418 January 2019withdrawn 13 March 2019
Easter Drumclair Wood P/19/0183/FUL425 March 2019replaced by a revised application
Easter Drumclair Wood P/21/0242/FUL428 April 2021replaced by a revised application

Who decides

ApplicationsFalkirkUK
Decided applications (solar, wind, battery)1910,236
Refused3 (16%)19%
Solar refused0 of 812%
Onshore wind refused3 of 545%
Battery storage refused0 of 616%
Median time from submission to decision8.0 weeks17.0 weeks
Appeals lodged / allowed1 / 2—

Other large projects within 10 km

ProjectTypeMWStatuskm
Burnheadwind farm26operational2.7
Drumduffwind farm8.5operational3.0
Drumduff Wind Farm Extensionwind farm15approved, not built3.6
Nether braco Farmwind farm21application withdrawn5.0
Heights Road, Blackridge - Woodend Wind Farmwind farm19.8application submitted5.2
Forrestfield Wind Farmwind farm13.2application submitted5.3
Torrance Farm Wind Park Extensionwind farm5.7operational6.7
Greengairs East Wind Farmwind farm24operational6.7
Bracco / Black Hillwind farm72.5application withdrawn7.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.9242, -3.812).