Energy Projects Near You

Solar, wind and battery projects near Falkirk (FK1)

30 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of FK1 (Falkirk): 18 approved but not yet running, 4 operational. The largest live scheme is Glenside Farm (400 MW battery storage, approved on 25 February 2025, not yet built), 9.2 km away. Source: Renewable Energy Planning Database, July 2026 extract.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

30projects within 10 km
0awaiting a decision
18approved, not running
4operational

Projects within 10 km of FK1

Projects of 1 MW and more (15)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Merchiston Industrial Estate, Smith Streetbattery storagebattery storage43under constructionupdated Dec 2025Feb 2023granted Jun 2023Dec 2025Falkirk3.4
Asda Grangemouth Depotwind farmwind farm4refusedupdated Mar 2009Feb 2007refused Dec 2007Mar 2009Falkirk3.7
ASDA Distribution Centrewind turbinewind turbine2permission expiredupdated Apr 2017Nov 2007granted Mar 2009Apr 2017Falkirk4.0
Land adjacent Bonnybridge Substationbattery storagebattery storage19.9abandonedupdated Jul 2019Mar 2017—Jul 2019Falkirk4.8
Land To The East Of Wholeflats Road (Grangemouth)battery storagebattery storage20permission expiredupdated Aug 2020Apr 2018—Aug 2020Falkirk6.0
Easter Drumclair Woodwind farmwind farm6approved, not built may be out of dateupdated Apr 2022Feb 2022granted Apr 2022Apr 2022Falkirk6.8
Tod Hill Farm Wind Turbineswind farmwind farm12operationalupdated May 2015Jun 2011granted Jun 2012May 2015Falkirk6.8
Greenhill Farmwind turbinewind turbine2application withdrawnupdated Oct 2017Jun 2017—Oct 2017Falkirk7.4
Burnheadwind farmwind farm26operationalupdated Feb 2016Dec 2010granted Oct 2013Feb 2016West Lothian8.1
Rosehill Wind Turbineswind farmwind farm2.4operationalupdated Feb 2016Oct 2012granted Apr 2014Feb 2016Stirling8.1
Kinneil Kerse Wastewater Treatment Workssolar farmsolar farm1.2approved, not builtupdated Mar 2026Oct 2025granted Jan 2026Mar 2026Falkirk8.4
Drumduffwind farmwind farm8.5operationalupdated Feb 2018Feb 2014granted Jun 2015Feb 2018West Lothian8.9
Glenside Farmbattery storagebattery storage400approved, not builtupdated Mar 2025Feb 2024granted Feb 2025Mar 2025Stirling9.2
Drumelziewind turbinewind turbine1.5permission expiredupdated Sep 2020Mar 2015granted Dec 2016Sep 2020West Lothian9.2
Drumduff Wind Farm Extensionwind farmwind farm15approved, not builtupdated Feb 2026Jun 2023granted Apr 2024Feb 2026West Lothian9.5
Smaller schemes under 1 MW, mostly rooftop solar (15)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updatedCouncilkm
Unit 2, Tamfourhill Avenue - Micro Energy Storagebattery storagebattery storage0.2approved, not builtupdated Jun 2025Mar 2025granted May 2025Jun 2025Falkirk2.5
Central Boulevard, Central Park - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Jun 2025Mar 2025granted May 2025Jun 2025Falkirk2.6
Wonder World, Castlelaurie Industrial Estaterooftop solarrooftop solar0.2approved, not builtupdated Apr 2024Feb 2024granted Mar 2024Apr 2024Falkirk3.2
The Helix Park - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Jun 2025Mar 2025granted May 2025Jun 2025Falkirk3.8
West Carron Works, Stenhouse Roadrooftop solarrooftop solar0.6approved, not built may be out of dateupdated Jun 2023Apr 2023granted Jun 2023Jun 2023Falkirk4.1
Abbotshaugh, Sawmill Abbots Roadbattery storagebattery storage—approved, not builtupdated Jun 2025Mar 2025granted May 2025Jun 2025Falkirk4.3
Whyte and Mackayrooftop solarrooftop solar0.2approved, not builtupdated Oct 2024Aug 2024granted Oct 2024Oct 2024Falkirk5.3
Roughmute Sewage Treatment Worksrooftop solarrooftop solar0.8approved, not built may be out of dateupdated Nov 2022Sep 2022granted Nov 2022Nov 2022Falkirk5.4
Forth Valley Royal Hospital, Stirling Roadrooftop solarrooftop solar0.2approved, not builtupdated Aug 2023Jul 2023granted Aug 2023Aug 2023Falkirk5.7
North-East of Spitfire Way - GCPbattery storagebattery storage—permission expiredupdated Sep 2019Aug 2017—Sep 2019Falkirk5.9
Central Boulevard, Central Parkrooftop solarrooftop solar—approved, not builtupdated May 2025Feb 2025granted Apr 2025May 2025Falkirk6.0
Abbotsinch Road - Micro Energy Storage Facilitybattery storagebattery storage0.2approved, not builtupdated Jun 2025Mar 2025granted May 2025Jun 2025Falkirk6.2
North Inches Solar Photovoltaic Electricity Generationsolar farmsolar farm—application withdrawnupdated Nov 2023Mar 2022—Nov 2023Falkirk6.8
Denny Wastewater Treatment, Winchester Avenuesolar farmsolar farm0.4approved, not builtupdated Dec 2022Aug 2022granted Nov 2022Dec 2022Falkirk7.9
Campbells Prime Meat, The Heatherfield Whitecrosssolar farmsolar farm—approved, not built may be out of dateupdated Oct 2022Aug 2022granted Oct 2022Oct 2022Falkirk8.4

Distance from the average position of the FK1 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.

By type

TypeAllPendingApprovedOperationalRefusedMW in pipeline
Solar farm403001.6
Rooftop solar606002
Wind farm7024121
Wind turbine300000
Battery storage100700444

MW in pipeline: pending, approved and under-construction capacity.

How Falkirk decides solar, wind and battery applications

ApplicationsFalkirkUK
Decided applications (solar, wind, battery)1910,236
Refused3 (16%)19%
Solar refused0 of 812%
Onshore wind refused3 of 545%
Battery storage refused0 of 616%
Median time from submission to decision8.0 weeks17.0 weeks
Appeals lodged / allowed1 / 2—

All projects in Falkirk

Is the status up to date?

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near FK1, 4 projects have a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.