Fairfield Farm (7.8 MW wind farm)

Fairfield Farm is a 7.8 MW wind farm project in Cumberland, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 23 June 2009; the record was last updated on 23 June 2009.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

7.8 MWwind farm
application withdrawnstatus in REPD
23 June 2009record last updated
Cumberlandcouncil area

Planning timeline

DateStage
29 September 2005Application submitted
23 June 2009Application withdrawn

Project details

Technology
wind farm
Capacity
7.8 MW
Status (REPD)
application withdrawn
Record last updated
23 June 2009
Operator or applicant
Windprospect
Planning authority
Cumberland
Planning application reference
4/05/2738/0FI
Turbines
6
Address (REPD)
Pica, Whitehaven
Council area (by location)
Cumberland
REPD reference
3615

Earlier applications for this site

ApplicationMWSubmittedOutcome
Fairfield Farm Wind Farm 04/95/05595.911 August 1995refused 1 April 1996
Fairfield Farm 4/2006/26846.529 September 2006operational since 2 March 2011

Who decides

ApplicationsCumberlandUK
Decided applications (solar, wind, battery)9110,236
Refused30 (33%)19%
Solar refused4 of 3212%
Onshore wind refused25 of 4545%
Battery storage refused1 of 1416%
Median time from submission to decision22.4 weeks17.0 weeks
Appeals lodged / allowed7 / 9—

Other large projects within 10 km

ProjectTypeMWStatuskm
Fairfield Farmwind farm6.5operational0.3
Weddicar Rigg Wind Farmwind farm12refused on appeal2.2
Potato Pot Wind Farmwind farm6operational3.0
Dean Moor Solar Farm & Battery Storagesolar farm150approved, not built3.6
Lillyhall Wind Farmwind farm9.2refused3.6
Moorhouse Farmsolar farm5operational3.9
Winscales Phase I and IIwind farm8.8operational5.7
Winscales Moorwind farm6operational7.3
Woodend And Moor Row, Egremontbattery storage30approved, not built7.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.5791, -3.5254).