Winscales Phase I and II (8.8 MW wind farm)

Winscales Phase I and II is an 8.8 MW wind farm project in Cumberland, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 1 December 2004; the record was last updated on 7 September 2009.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

8.8 MWwind farm
operationalstatus in REPD
7 September 2009record last updated
Cumberlandcouncil area

Planning timeline

DateStage
18 November 1997Application submitted
7 June 1999Planning permission granted
1 December 2004Operational

Project details

Technology
wind farm
Capacity
8.8 MW
Status (REPD)
operational
Record last updated
7 September 2009
Operator or applicant
Cumbria Wind Farms
Planning authority
Cumberland
Planning application reference
2/97/0902
Turbines
11
Address (REPD)
Winscales, Workington, Cumbria
Council area (by location)
Cumberland
Time to decision
81 weeks
REPD reference
3492

Who decides

ApplicationsCumberlandUK
Decided applications (solar, wind, battery)9110,236
Refused30 (33%)19%
Solar refused4 of 3212%
Onshore wind refused25 of 4545%
Battery storage refused1 of 1416%
Median time from submission to decision22.4 weeks17.0 weeks
Appeals lodged / allowed7 / 9—

Other large projects within 10 km

ProjectTypeMWStatuskm
Winscales Moorwind farm6operational1.6
Lillyhall Wind Farmwind farm9.2refused2.1
Moorhouse Farmsolar farm5operational2.3
Potato Pot Wind Farmwind farm6operational2.9
Dean Moor Solar Farm & Battery Storagesolar farm150approved, not built4.0
Iggesund Wind Farmwind farm9refused4.6
Oldside Wind Farmwind farm5.4operational4.8
St Helen's Lanesolar farm5operational5.2
Fairfield Farmwind farm6.5operational5.7

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.6288, -3.5041).