Oldside Wind Farm (5.4 MW)

Oldside Wind Farm is a 5.4 MW wind farm project in Cumberland, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 1 September 1996; the record was last updated on 11 April 2011.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

5.4 MWwind farm
operationalstatus in REPD
11 April 2011record last updated
Cumberlandcouncil area

Planning timeline

DateStage
31 October 1995Application submitted
10 January 1996Planning permission granted
1 September 1996Operational

Project details

Technology
wind farm
Capacity
5.4 MW
Status (REPD)
operational
Record last updated
11 April 2011
Operator or applicant
Windprospect / Windcluster
Planning authority
Cumberland
Planning application reference
not recorded
Turbines
9
Address (REPD)
Oldside Wind Farm Workington Cumbria
Council area (by location)
Cumberland
Time to decision
10 weeks
REPD reference
2625

Who decides

ApplicationsCumberlandUK
Decided applications (solar, wind, battery)9110,236
Refused30 (33%)19%
Solar refused4 of 3212%
Onshore wind refused25 of 4545%
Battery storage refused1 of 1416%
Median time from submission to decision22.4 weeks17.0 weeks
Appeals lodged / allowed7 / 9—

Other large projects within 10 km

ProjectTypeMWStatuskm
Iggesund Wind Farmwind farm9refused0.8
St Helen's Lanesolar farm5operational2.5
Land at Flimby Hall Farmwind farm6.2operational4.1
Winscales Moorwind farm6operational4.3
Winscales Phase I and IIwind farm8.8operational4.8
Moorhouse Farmsolar farm5operational5.3
Lillyhall Wind Farmwind farm9.2refused6.3
Ewanrigg Farmhouse, Ewanrigg Solar Farmsolar farm13approved, not built6.6
Potato Pot Wind Farmwind farm6operational7.2

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (54.6596, -3.5564).