Fendyke Solar Farm (17.6 MW)

Fendyke Solar Farm is a 17.6 MW solar farm project in South Holland, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: abandoned; the record was last updated on 21 May 2018.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

17.6 MWsolar farm
abandonedstatus in REPD
21 May 2018record last updated
South Hollandcouncil area

Planning timeline

DateStage
15 September 2014Application submitted
8 December 2014Planning permission granted
8 December 2017Permission expired

Project details

Technology
solar farm
Capacity
17.6 MW
Status (REPD)
abandoned
Record last updated
21 May 2018
Operator or applicant
BE Renewables/Little Eau Solar
Planning authority
South Holland
Planning application reference
H20-0764-14
Site area
19.2 ha
Address (REPD)
Fendyke Farm, Fen Dyke, Sutton St James, Spalding,
Council area (by location)
South Holland
Time to decision
12 weeks
REPD reference
2276

Earlier applications for this site

ApplicationMWSubmittedOutcome
Fendyke Solar Farm H20-0017-1418.613 January 2014refused 11 July 2014

Who decides

ApplicationsSouth HollandUK
Decided applications (solar, wind, battery)4410,236
Refused11 (25%)19%
Solar refused7 of 2612%
Onshore wind refused2 of 345%
Battery storage refused2 of 1516%
Median time from submission to decision13.8 weeks17.0 weeks
Appeals lodged / allowed5 / 6—

UK: all UK planning authorities. Counted under these REPD planning authority names: Lincolnshire, South Holland.

Other large projects within 10 km

ProjectTypeMWStatuskm
Fendyke Farm Solar Farmsolar farm20refused0.4
Fendyke Farmbattery storage10refused0.4
Fendyke Solar Farm - Extensionsolar farm5refused on appeal1.2
Grange Farm (Lincolnshire)solar farm12.7operational2.5
Treading Wind Farm - Fenlandwind farm15refused on appeal4.4
Treading Wind Farm - South Hollandwind farm5refused4.9
Delph Wind Farmwind farm27application withdrawn5.0
Treading Bank Solar Farmsolar farm49.9refused6.0
Tydd Solar Farmsolar farm24.9refused6.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.7312, 0.0227).