Treading Bank Solar Farm (49.9 MW)

Treading Bank Solar Farm is a 49.9 MW solar farm project in Fenland, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 4 December 2025; the record was last updated on 16 December 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

49.9 MWsolar farm
refusedstatus in REPD
16 December 2025record last updated
Fenlandcouncil area

Planning timeline

DateStage
13 October 2025Application submitted
4 December 2025Refused by the planning authority

Project details

Technology
solar farm
Capacity
49.9 MW
Status (REPD)
refused
Record last updated
16 December 2025
Operator or applicant
Renewable Connections
Planning authority
Fenland
Planning application reference
F/YR25/0758/F
Site area
96.5 ha
Address (REPD)
Sw/O Treading Bank, Tydd St Giles, Wisbech
Council area (by location)
Fenland
Time to decision
7 weeks
REPD reference
14243

Who decides

ApplicationsFenlandUK
Decided applications (solar, wind, battery)4910,236
Refused10 (20%)19%
Solar refused3 of 2312%
Onshore wind refused6 of 2145%
Battery storage refused1 of 516%
Median time from submission to decision23.4 weeks17.0 weeks
Appeals lodged / allowed0 / 3—

Other large projects within 10 km

ProjectTypeMWStatuskm
Lapwing Fen II, Crown Farmbattery storage49.9approved, not built4.1
Lapwing Fen 2 Battery Storage Plantbattery storage250under construction4.1
The Grange Wind Farmwind farm14operational4.5
Grange Farm (Lincolnshire)solar farm12.7operational4.5
Delph Wind Farmwind farm27application withdrawn4.7
Gunthorpe Road, Marsh Solar Farmsolar farm49.9approved, not built5.0
Tydd Solar Farmsolar farm24.9refused5.0
Tydd Solar Farmbattery storage15refused5.0
Tydd Solar Farmbattery storage15refused5.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.7278, 0.1114).