Energy Projects Near You

Galton Manor Farm Solar Farm (30 MW)

Galton Manor Farm Solar Farm is a 30 MW solar farm project in Dorset, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 30 March 2023, not yet built; the record was last updated on 10 May 2022. REPD records the planning permission as expiring on 28 April 2026, but the project holds a Contracts for Difference award (AR5), so construction may have started. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

30 MWsolar farm
approved, not builtmay be out of datestatus in REPD
10 May 2022record last updated
Dorsetcouncil area

REPD records the planning permission as expiring on 28 April 2026, but the project holds a Contracts for Difference award (AR5), so construction may have started.

Planning timeline

DateStage
13 April 2022Application submitted
30 March 2023Planning permission granted
28 April 2026Permission expired

Project details

Technology
solar farm
Capacity
30 MW
Status (REPD)
approved, not built
Record last updated
10 May 2022
Operator or applicant
Spring Dev 05 Limited
Planning authority
Dorset
Planning application reference
P/FUL/2022/02429
Site area
48.3 ha
Address (REPD)
Galton Manor Farm
Council area (by location)
Dorset
Time to decision
50 weeks
Contracts for Difference
AR5
Name in REPD
Galton Manor Farm - Solar Farm
REPD reference
11197

Who decides

ApplicationsDorsetUK
Decided applications (solar, wind, battery)12510,236
Refused23 (18%)19%
Solar refused15 of 10512%
Onshore wind refused5 of 545%
Battery storage refused3 of 1516%
Median time from submission to decision19.0 weeks17.0 weeks
Appeals lodged / allowed6 / 6—

Other large projects within 10 km

ProjectTypeMWStatuskm
Galton Manor Solar Parksolar farm5operational0.9
Land at East Farmsolar farm5operational1.1
North Fossil Farmsolar farm40approved, not built2.3
Holly Farm Solar Parksolar farm5operational2.5
Crossways Pit Solar Farmsolar farm5operational3.9
Woolbridge Solar Parksolar farm5operational7.0
Yellowham solar parksolar farm20refused on appeal9.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (50.6654, -2.3165).