Renewable energy projects in Dorset

138 solar, wind or battery projects of 150 kW or more are located in Dorset (REPD, July 2026 extract): 5 pending, 60 approved but not running, 46 operational and 11 refused. The council refused 23 of 125 decided applications (18%; UK 19%), with a median 19 weeks from submission to decision.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

138projects in the council area
5awaiting a decision
60approved, not running
18%of decisions refused

How Dorset decides

ApplicationsDorsetUK
Decided applications (solar, wind, battery)12510,236
Refused23 (18%)19%
Solar refused15 of 10512%
Onshore wind refused5 of 545%
Battery storage refused3 of 1516%
Median time from submission to decision19.0 weeks17.0 weeks
Appeals lodged / allowed6 / 6—

Projects in Dorset

Projects of 1 MW and more (89)

ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updated
East Chickerell Court Farmbattery storagebattery storage400approved, not builtupdated Feb 2025Aug 2023granted Jan 2025Feb 2025
Buckland Battery Storagebattery storagebattery storage150refusedupdated Dec 2025Sep 2024refused Jul 2025Dec 2025
Shaftesbury Energy Parkbattery storagebattery storage100approved, not builtupdated Feb 2022Oct 2022granted Mar 2023Feb 2022
Coldharbour, Chickerellbattery storagebattery storage60refusedupdated Apr 2024Apr 2023refused Mar 2024Apr 2024
Fernbrook Solar farm & Battery storagesolar farmsolar farm49.9approved, not built may be out of dateupdated Dec 2022Jul 2021granted Feb 2023Dec 2022
Mannington Battery Energy Storage Systembattery storagebattery storage49.9under constructionupdated Mar 2021Jan 2021granted Jul 2021Mar 2021
Eweleaze Spinneybattery storagebattery storage49.9approved, not builtupdated Apr 2025Sep 2024granted Apr 2025Apr 2025
Holt Roadbattery storagebattery storage47.5approved, not builtupdated Sep 2024Nov 2023granted Jul 2024Sep 2024
North Fossil Farmsolar farmsolar farm40approved, not built may be out of dateupdated Feb 2022Jan 2021granted Jan 2022Feb 2022
South Farm Solar Parksolar farmsolar farm40operationalupdated Dec 2022Jun 2019granted Jun 2020Dec 2022
Caswell Farm, Common Lane Solar Farmsolar farmsolar farm40application submittedupdated Oct 2025Aug 2025—Oct 2025
Higher Stockbridge Farmsolar farmsolar farm35approved, not built may be out of dateupdated Sep 2023Dec 2019granted Dec 2021Sep 2023
Clifton Farmsolar farmsolar farm35operationalupdated Nov 2025May 2020granted May 2021Nov 2025
Solar Farm at Pipplepen Farm Solar Parksolar farmsolar farm32approved, not built may be out of dateupdated Aug 2021Aug 2021granted Jan 2023Aug 2021
Post Farm, Lytchett Minsterbattery storagebattery storage32approved, not builtupdated Jan 2025May 2023granted Nov 2024Jan 2025
Galton Manor Farm Solar Farmsolar farmsolar farm30approved, not built may be out of dateupdated May 2022Apr 2022granted Mar 2023May 2022
Woodlands Manor Farm, Horton Solar Farmsolar farmsolar farm30approved, not builtupdated Jun 2025Jun 2023granted May 2025Jun 2025
North Dairy Farm Solar Farmsolar farmsolar farm30approved, not builtupdated Jun 2026Apr 2021granted Jan 2024Jun 2026
Stokeford Farmsolar farmsolar farm28.5operationalupdated Nov 2024Aug 2015granted Oct 2015Nov 2024
Part Bushes Farmwind farmwind farm24.8refusedupdated Jun 2011Aug 2003refused Oct 2004Jun 2011
Mapperton Farmsolar farmsolar farm24application withdrawnupdated Jul 2018Jul 2013—Jul 2018
Rampisham Down Transmitting Stationsolar farmsolar farm24application withdrawnupdated Jul 2017Dec 2012—Jul 2017
Verwood Solar Farmsolar farmsolar farm20.4operationalupdated May 2015Apr 2014granted Jul 2014May 2015
Yellowham solar parksolar farmsolar farm20refused on appealupdated Aug 2015Jun 2014refused Nov 2014Aug 2015
Hawkers Hill Energy Parkbattery storagebattery storage20operationalupdated Oct 2022Jul 2017granted Sep 2017Oct 2022
Caswell Farm, Common Lanebattery storagebattery storage20application submittedupdated Oct 2025Aug 2025—Oct 2025
North Farm, Horton Solar Farmsolar farmsolar farm19approved, not builtupdated Jun 2025May 2023granted May 2025Jun 2025
Slyer's Lanewind farmwind farm18refusedupdated Feb 2016Nov 2014refused Jan 2016Feb 2016
Blandford Hill - EV Charging Station & Solar Farmsolar farmsolar farm15approved, not builtupdated Apr 2021Jul 2021granted Jan 2022Apr 2021
Wraxall Road, Higher Wraxall Solar Farmsolar farmsolar farm13.5application withdrawnupdated Jun 2026Feb 2023—Jun 2026
Homeland Solar Farmsolar farmsolar farm13.2operationalupdated Jan 2015May 2013granted Oct 2013Jan 2015
Wedgehill Farmsolar farmsolar farm13operationalupdated Mar 2015Jul 2013granted Jan 2014Mar 2015
West Dorset Wind Farmwind farmwind farm12.5application withdrawnupdated Nov 2015May 2014—Nov 2015
Littletonsolar farmsolar farm12.1operationalupdated May 2015Sep 2014granted Dec 2014May 2015
Blandford Hill Wind Farmwind farmwind farm12refusedupdated Apr 2015Jun 2014refused Mar 2015Apr 2015
Stour Row Solar Farmsolar farmsolar farm12permission expiredupdated Oct 2016Jun 2011granted Aug 2011Oct 2016
Motcombe Road, Motcombe Solar Pv Arrayssolar farmsolar farm12application submittedupdated Sep 2025Jul 2025—Sep 2025
Cruxton Farm Solar Farmsolar farmsolar farm12refusedupdated Dec 2025Apr 2025refused Oct 2025Dec 2025
North Farm (Spetisbury)solar farmsolar farm11.6operationalupdated May 2015Aug 2014granted Nov 2014May 2015
South Newton Farmsolar farmsolar farm11.3operationalupdated Jan 2017Mar 2013granted Jun 2013Jan 2017
Higher Farmsolar farmsolar farm11refused on appealupdated Sep 2020Apr 2019—Sep 2020
Corton Farmsolar farmsolar farm10refusedupdated Mar 2014Jun 2013refused Nov 2013Mar 2014
Bottom Plainsolar farmsolar farm10operationalupdated Apr 2015Aug 2013granted Nov 2013Apr 2015
Silton Wind Farmwind farmwind farm10refused on appealupdated Dec 2012Aug 2010refused Mar 2011Dec 2012
South Farm Solar Parkbattery storagebattery storage10operationalupdated Dec 2022Jun 2019granted Mar 2020Dec 2022
Alaska Wind Farmwind farmwind farm9.2operationalupdated May 2026Nov 2009granted Jul 2012May 2026
Southern Counties Shooting Ground Phase 1solar farmsolar farm9operationalupdated Mar 2017Dec 2014granted Sep 2015Mar 2017
Canada Farmsolar farmsolar farm8.3operationalupdated Feb 2015Jul 2013granted Mar 2014Feb 2015
Hale Farmsolar farmsolar farm8operationalupdated Mar 2016Oct 2014granted Sep 2015Mar 2016
Trigon Solar Farmsolar farmsolar farm7operationalupdated Apr 2013Jul 2012granted Nov 2012Apr 2013
Bedborough Farmsolar farmsolar farm7operationalupdated Mar 2016Aug 2014granted Nov 2014Mar 2016
Caswell Farm Solar Parksolar farmsolar farm6.7operationalupdated Aug 2016Mar 2013granted Dec 2013Aug 2016
Land east of Littledown Business Parksolar farmsolar farm6.2operationalupdated Aug 2016Jul 2014granted Dec 2014Aug 2016
Race farmsolar farmsolar farm6.1operationalupdated Jan 2017Mar 2013granted Jun 2013Jan 2017
Nottington Lane Solar Farmsolar farmsolar farm5operationalupdated Jun 2013May 2012granted Sep 2012Jun 2013
Crossways Pit Solar Farmsolar farmsolar farm5operationalupdated Jun 2013Feb 2011granted Aug 2011Jun 2013
Dolmans Hill (Redbridge Farm) Solar Arrayssolar farmsolar farm5operationalupdated Jan 2014Apr 2012granted Nov 2012Jan 2014
Woolbridge Solar Parksolar farmsolar farm5operationalupdated Aug 2017Aug 2013granted Dec 2013Aug 2017
Manor Farm (Dorset)solar farmsolar farm5operationalupdated Jul 2014Aug 2013granted Nov 2013Jul 2014
Oaklands Plantationsolar farmsolar farm5operationalupdated Jan 2017Jun 2014granted Nov 2014Jan 2017
Cross Roads Plantationsolar farmsolar farm5operationalupdated Aug 2017Aug 2014granted Nov 2014Aug 2017
Bourne Park (Solar)solar farmsolar farm5operationalupdated May 2015Aug 2013granted Oct 2013May 2015
Land at Newlands Farmsolar farmsolar farm5operationalupdated Apr 2016Oct 2014granted Dec 2014Apr 2016
Rampisham Northsolar farmsolar farm5operationalupdated May 2017Nov 2014granted Dec 2016May 2017
Land at Stalbridge Parksolar farmsolar farm5operationalupdated Jun 2017Jul 2015granted Oct 2015Jun 2017
Galton Manor Solar Parksolar farmsolar farm5operationalupdated Jun 2017Jul 2015granted Sep 2016Jun 2017
The Down Housesolar farmsolar farm5abandonedupdated Oct 2018Sep 2015granted Mar 2017Oct 2018
Holly Farm Solar Parksolar farmsolar farm5operationalupdated Jun 2017Jul 2015granted Dec 2015Jun 2017
Land at East Farmsolar farmsolar farm5operationalupdated Jun 2017Jul 2015granted Sep 2016Jun 2017
Alton Mead Lanesolar farmsolar farm5permission expiredupdated Jan 2020Sep 2015granted Jan 2016Jan 2020
Gashay Lanesolar farmsolar farm5refusedupdated May 2016Oct 2015refused Apr 2016May 2016
Southern Counties Shooting Ground Phase 2solar farmsolar farm5operationalupdated Jun 2017Sep 2015granted Jan 2016Jun 2017
Warren Park Solar Farmsolar farmsolar farm5permission expiredupdated Jul 2020Sep 2015granted Dec 2015Jul 2020
Park Farmsolar farmsolar farm4operationalupdated Jun 2013Mar 2011granted May 2011Jun 2013
Chapel Lane Parley Solar Farm Phase 3solar farmsolar farm4operationalupdated Nov 2015Aug 2014granted Jan 2015Nov 2015
Henbury Quarrysolar farmsolar farm3.9operationalupdated May 2015Sep 2013granted May 2014May 2015
Woodtown Farmsolar farmsolar farm3.8operationalupdated Mar 2016Oct 2014granted Oct 2015Mar 2016
North of Newton Farmsolar farmsolar farm3operationalupdated Mar 2015Mar 2013granted Jun 2013Mar 2015
Independent Quarriessolar farmsolar farm3abandonedupdated Dec 2018Feb 2015granted Sep 2015Dec 2018
Blandford Hill - EV Charging Station & Solar Farmbattery storagebattery storage3approved, not builtupdated Jan 2023Jul 2021granted Jan 2022Jan 2023
Brackenbury Infant Schoolwind turbinewind turbine2.5application withdrawnupdated Feb 2009Oct 2001—Feb 2009
Bourne Farmsolar farmsolar farm2.4operationalupdated May 2016Aug 2013granted Oct 2013May 2016
Rogers Hill Farm -Wind Turbine Repoweringwind turbinewind turbine2application submittedupdated Apr 2025Mar 2025—Apr 2025
Slaughtergate Farmsolar farmsolar farm1.8operationalupdated Apr 2013Aug 2012granted Nov 2012Apr 2013
The Fernssolarsolar1.5abandonedupdated Aug 2015May 2013granted Jul 2013Aug 2015
Okeford Fitzpaine Solar Farmsolar farmsolar farm1.5application withdrawnupdated Jun 2012Mar 2012—Jun 2012
Solar Farm at Adjacent Beech Farmsolar farmsolar farm1.5abandonedupdated Jan 2014Apr 2012granted Sep 2012Jan 2014
Rudge Hill Farmsolar farmsolar farm1.5operationalupdated Aug 2015Mar 2012granted Feb 2013Aug 2015
Tecan Way, Granby Industrial Estate Solar Photo Voltaic Panelsrooftop solarrooftop solar1approved, not built may be out of dateupdated May 2023Apr 2023granted Jun 2023May 2023
Smaller schemes under 1 MW, mostly rooftop solar (49)
ProjectTypeMWStatus (REPD)SubmittedDecisionRecord updated
Merck, The Old Brickyard Solar Photo-Voltaic Modulesrooftop solarrooftop solar0.7approved, not builtupdated May 2025Mar 2025granted Apr 2025May 2025
Brickfields Business Park, Unit 17rooftop solarrooftop solar0.6under constructionupdated Jan 2023Oct 2022granted Jul 2023Jan 2023
Thomas Hardye Schoolrooftop solarrooftop solar0.6approved, not builtupdated Jun 2025Mar 2025granted May 2025Jun 2025
Weymouth College Solar Panelsrooftop solarrooftop solar0.5approved, not builtupdated May 2021Feb 2021granted May 2021May 2021
Sainsburys Supermarket, Ringwood Roadrooftop solarrooftop solar0.4approved, not builtupdated Apr 2025Feb 2025granted Mar 2025Apr 2025
Morrisons Supermarket, Dorchester Roadrooftop solarrooftop solar0.4approved, not builtupdated Dec 2022Oct 2022granted Nov 2022Dec 2022
Brickfields Business Park, Unit 35rooftop solarrooftop solar0.3under constructionupdated Jan 2023Oct 2022granted May 2023Jan 2023
Slepe Farmbattery storagebattery storage0.3operationalupdated Nov 2016Jun 2011granted Aug 2011Nov 2016
Chickerell Solar Photovoltaics Panelrooftop solarrooftop solar0.3approved, not builtupdated Jun 2022May 2022granted Jul 2022Jun 2022
Warmwell Leisure Resort, Warmwell Roadrooftop solarrooftop solar0.3approved, not builtupdated Nov 2022Sep 2022granted Oct 2022Nov 2022
Littlesea Holiday Park, Lynch Lane Solar photovoltaicsrooftop solarrooftop solar0.3approved, not builtupdated Feb 2023Dec 2022granted Feb 2023Feb 2023
The Purbeck Schoolrooftop solarrooftop solar0.3approved, not builtupdated Jan 2022Sep 2021granted Nov 2021Jan 2022
Golden Cap Holiday Park, Seatownsolar farmsolar farm0.3approved, not built may be out of dateupdated May 2023Nov 2022granted May 2023May 2023
Ferndown Upper Schoolrooftop solarrooftop solar0.3approved, not builtupdated Jan 2022Nov 2021granted Jan 2022Jan 2022
High Eastrooftop solarrooftop solar0.3approved, not built may be out of dateupdated Jul 2022Jun 2022granted Sep 2022Jul 2022
Lytchett Minster School, Post Green Roadrooftop solarrooftop solar0.3application withdrawnupdated May 2026Apr 2026—May 2026
Atrim Road, Dotterysolar farmsolar farm0.2approved, not built may be out of dateupdated Mar 2023Sep 2022granted Feb 2023Mar 2023
Sandford Holiday Park, Organford Roadrooftop solarrooftop solar0.2approved, not builtupdated Nov 2022Sep 2022granted Nov 2022Nov 2022
Riversmeet, Hardings Lanerooftop solarrooftop solar0.2approved, not builtupdated Jun 2023May 2023granted Jun 2023Jun 2023
Cherry Groverooftop solarrooftop solar0.2approved, not builtupdated Jan 2022Nov 2021granted Jan 2022Jan 2022
County Hallrooftop solarrooftop solar0.2approved, not builtupdated Dec 2021Sep 2021granted Nov 2021Dec 2021
Jubilee Close Solar photovoltaicsrooftop solarrooftop solar0.2approved, not builtupdated Dec 2021Nov 2021granted Jan 2022Dec 2021
Whittle Boxland, Whittle Road Energy Storage Facilitybattery storagebattery storage0.2approved, not built may be out of dateupdated Nov 2022Sep 2022granted Nov 2022Nov 2022
Seaview Holiday Park,Preston Road- Solar Photovoltaics Panelsrooftop solarrooftop solar0.2approved, not builtupdated Feb 2023Dec 2022granted Feb 2023Feb 2023
Birchwood Tourist Park, Bere Roadsolar farmsolar farm0.2approved, not built may be out of dateupdated Jun 2023Jan 2023granted Jun 2023Jun 2023
Highlands End Holiday Park, Highlands End -Solar PV Panelssolar farmsolar farm0.2approved, not builtupdated Nov 2023Feb 2023granted Oct 2023Nov 2023
Prince Of Wales Road Solar Photovoltaic Equipmentrooftop solarrooftop solar0.2approved, not builtupdated Jun 2023May 2023granted Jun 2023Jun 2023
Bridec Melamine Boards, West Bay Roadrooftop solarrooftop solar0.2approved, not builtupdated Aug 2023Jun 2023granted Aug 2023Aug 2023
Sandford Road, Sandford Solar Photovoltaics PV Equipmentrooftop solarrooftop solar0.2approved, not builtupdated Jan 2022Nov 2021granted Jan 2022Jan 2022
Lower Silton, Fantley Lanesolar farmsolar farm0.2application withdrawnupdated Nov 2023Aug 2023—Nov 2023
Damers First Schoolrooftop solarrooftop solar0.2approved, not builtupdated Jun 2025Mar 2025granted May 2025Jun 2025
Dextra Group, Brickfields Business Park Solar PV Systemsrooftop solarrooftop solar0.2approved, not builtupdated Apr 2024Mar 2024granted Apr 2024Apr 2024
Brickfields Business Park, Unit 16rooftop solarrooftop solar0.2under constructionupdated Jan 2023Oct 2022granted May 2023Jan 2023
Cumberland Drive, Granby Industrial Estaterooftop solarrooftop solar0.2approved, not builtupdated Nov 2022Oct 2022granted Nov 2022Nov 2022
Dorset Innovation Park, Newburghrooftop solarrooftop solar0.2approved, not builtupdated Sep 2025Jul 2025granted Aug 2025Sep 2025
Brickfields Business Park, Unit 24rooftop solarrooftop solar0.2under constructionupdated Jan 2023Oct 2022granted May 2023Jan 2023
Shrubbery Lanerooftop solarrooftop solar0.1approved, not builtupdated Jan 2022Nov 2021granted Jan 2022Jan 2022
Copse Barn, Wytherston Farmrooftop solarrooftop solar0.1approved, not builtupdated Aug 2024Jun 2023granted Jul 2024Aug 2024
St Giles House, Creech Hillsolar farmsolar farm0.1approved, not builtupdated Jan 2024Dec 2023granted Jan 2024Jan 2024
The Purbeck School, Worgret Roadrooftop solarrooftop solar0.1approved, not builtupdated May 2025Mar 2025granted Apr 2025May 2025
Burton Bradstock Solar Panelsrooftop solarrooftop solar—under constructionupdated Jan 2021Oct 2020granted Jan 2021Jan 2021
Fernbrook Solar farm & Battery storagebattery storagebattery storage—approved, not built may be out of dateupdated Nov 2022Jul 2021granted Feb 2023Nov 2022
Conifers Primary School Solar Photovoltaicsrooftop solarrooftop solar—approved, not builtupdated Dec 2021Sep 2021granted Nov 2021Dec 2021
Chickerell Road, Chickerell Solar Photovoltaics (PV) Equipmentrooftop solarrooftop solar—operationalupdated Dec 2021Nov 2021granted Apr 2022Dec 2021
Dorchesters Corn Exchange Solar Panels & Biomass Boilerrooftop solarrooftop solar—under constructionupdated Jun 2022Dec 2021granted Oct 2022Jun 2022
Wessex Water Palmersford Sewage Treatment, Humber Roadsolar farmsolar farm—application withdrawnupdated Jan 2023Nov 2022—Jan 2023
Hospital Metalcraft, Blandford Heights Industrial Estaterooftop solarrooftop solar—approved, not builtupdated Jan 2023Nov 2022granted Jan 2023Jan 2023
Tecan Way, Granby Industrial Estate - Ground Mounted Solar Panelssolar farmsolar farm—approved, not builtupdated Jul 2025Feb 2025granted Jun 2025Jul 2025
Waterside Holiday Park, Bowleaze Coveway Solar Arrayssolar farmsolar farm—application submittedupdated Oct 2025Sep 2025—Oct 2025

Postcode districts in Dorset

DistrictProjects within 10 kmPendingApprovedOperational
BH163421612
BH190000
BH20220911
BH213821814
BH223401911
BH31240138
DT1251117
DT211062
DT3281193
DT4221133
DT5170122
DT66060
DT716145
DT815064
DT918239
DT1010015
DT1113036
SP7161103
SP8282129

32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Projects belong to Dorset by location (nearest postcode to the REPD grid reference); decisions are counted by the planning authority named in REPD.