South Newton Farm (11.3 MW solar farm)

South Newton Farm is an 11.3 MW solar farm project in Dorset, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 19 March 2014; the record was last updated on 3 January 2017.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

11.3 MWsolar farm
operationalstatus in REPD
3 January 2017record last updated
Dorsetcouncil area

Planning timeline

DateStage
6 March 2013Application submitted
28 June 2013Planning permission granted
19 March 2014Operational

Project details

Technology
solar farm
Capacity
11.3 MW
Status (REPD)
operational
Record last updated
3 January 2017
Operator or applicant
Equitix
Planning authority
Dorset
Planning application reference
6/2013/0134
Site area
17.0 ha
Address (REPD)
Newton Farm, Lytchett Minster, Poole, Dorset
Council area (by location)
Dorset
Time to decision
16 weeks
REPD reference
2058

Who decides

ApplicationsDorsetUK
Decided applications (solar, wind, battery)12510,236
Refused23 (18%)19%
Solar refused15 of 10512%
Onshore wind refused5 of 545%
Battery storage refused3 of 1516%
Median time from submission to decision19.0 weeks17.0 weeks
Appeals lodged / allowed6 / 6—

Other large projects within 10 km

ProjectTypeMWStatuskm
Dolmans Hill (Redbridge Farm) Solar Arrayssolar farm5operational1.7
Race farmsolar farm6.1operational2.9
Post Farm, Lytchett Minsterbattery storage32approved, not built3.7
Oaklands Plantationsolar farm5operational4.7
Bottom Plainsolar farm10operational5.4
Trigon Solar Farmsolar farm7operational6.0
Mapperton Farmsolar farm24application withdrawn7.2
Holes Baybattery storage15operational7.6
Part Bushes Farmwind farm24.8refused7.7

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (50.7355, -2.0976).