Energy Projects Near You

Solar Farm at Pipplepen Farm Solar Park (32 MW)

Solar Farm at Pipplepen Farm Solar Park is a 32 MW solar farm project in Dorset, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 24 January 2023, not yet built; the record was last updated on 25 August 2021. REPD also records that the planning permission expired on 24 January 2026, so the project may not go ahead in this form. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

32 MWsolar farm
approved, not builtmay be out of datestatus in REPD
25 August 2021record last updated
Dorsetcouncil area

REPD also records that the planning permission expired on 24 January 2026, so the project may not go ahead in this form.

Planning timeline

DateStage
13 August 2021Application submitted
24 January 2023Planning permission granted
24 January 2026Permission expired

Project details

Technology
solar farm
Capacity
32 MW
Status (REPD)
approved, not built
Record last updated
25 August 2021
Operator or applicant
Elgin Energy ES Co Limited
Planning authority
Somerset
Planning application reference
21/00701/FUL
Site area
54.1 ha
Address (REPD)
Pipplepen Farm Solar Park, Pipplepen Lane, South Perrot, Beaminster
Council area (by location)
Dorset
Time to decision
76 weeks
Name in REPD
Pipplepen Farm Solar Park - Solar Farm
REPD reference
9481

Who decides

ApplicationsSomersetUK
Decided applications (solar, wind, battery)18510,236
Refused46 (25%)19%
Solar refused34 of 15312%
Onshore wind refused9 of 1045%
Battery storage refused3 of 2216%
Median time from submission to decision14.0 weeks17.0 weeks
Appeals lodged / allowed17 / 9—

Other large projects within 10 km

ProjectTypeMWStatuskm
Lower Severalls Farmsolar farm10.8operational4.1
Mahe Farm, Dunsham Lanesolar farm18.5refused6.2
Camp Road, West Cokersolar farm15.2approved, not built8.1
Rampisham Down Transmitting Stationsolar farm24application withdrawn9.9

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (50.8657, -2.7509).