Gelligaer 'B' Wind Farm (9.8 MW)

Gelligaer 'B' Wind Farm is a 9.8 MW wind farm project in Caerphilly, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 26 June 2002; the record was last updated on 26 June 2002.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

9.8 MWwind farm
application withdrawnstatus in REPD
26 June 2002record last updated
Caerphillycouncil area

Planning timeline

DateStage
26 June 2002Application withdrawn

Project details

Technology
wind farm
Capacity
9.8 MW
Status (REPD)
application withdrawn
Record last updated
26 June 2002
Operator or applicant
South Wales Power / SWALEC
Planning authority
Merthyr Tydfil
Planning application reference
T/99/0295
Address (REPD)
Gelligaer B Wind Farm Mynydd Fochriw Fochriw Mid Glamorgan
Council area (by location)
Caerphilly
REPD reference
2645

Who decides

Merthyr Tydfil has 5 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.

Other large projects within 10 km

ProjectTypeMWStatuskm
Gelligaer 'A' Wind Farmwind farm9.8application withdrawn<0.1
Bedlinog Wind Farmwind farm6application withdrawn1.1
Land At Cwm Bargoedsolar farm5operational2.7
Tir Nyth Soalr Parksolar farm5refused3.0
Convatec Green Manufacturing Hubwind farm15refused4.5
Convatec Green Manufacturing Hubsolar farm5refused4.5
Wauntysswg Farm, near Tredagarsolar farm30approved, not built5.0
Hendai Farmsolar farm13.4operational5.7
Pen March Wind Farmwind farm30refused6.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.723, -3.3043).