Bedlinog Wind Farm (6 MW)

Bedlinog Wind Farm is a 6 MW wind farm project in Merthyr Tydfil, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 11 September 2013; the record was last updated on 20 September 2013.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6 MWwind farm
application withdrawnstatus in REPD
20 September 2013record last updated
Merthyr Tydfilcouncil area

Planning timeline

DateStage
22 September 2011Application submitted
11 September 2013Application withdrawn

Project details

Technology
wind farm
Capacity
6 MW
Status (REPD)
application withdrawn
Record last updated
20 September 2013
Operator or applicant
Tegni Cymru
Planning authority
Merthyr Tydfil
Planning application reference
11/1150/03
Turbines
3
Address (REPD)
LAND AT BEDLINOG FARM, BEDLINOG CF46 6SN
Council area (by location)
Merthyr Tydfil
REPD reference
3830

Who decides

Merthyr Tydfil has 5 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.

Other large projects within 10 km

ProjectTypeMWStatuskm
Gelligaer 'A' Wind Farmwind farm9.8application withdrawn1.1
Gelligaer 'B' Wind Farmwind farm9.8application withdrawn1.1
Tir Nyth Soalr Parksolar farm5refused2.2
Land At Cwm Bargoedsolar farm5operational3.9
Hendai Farmsolar farm13.4operational4.6
Convatec Green Manufacturing Hubsolar farm5refused5.5
Convatec Green Manufacturing Hubwind farm15refused5.5
Wauntysswg Farm, near Tredagarsolar farm30approved, not built5.6
Pen March Wind Farmwind farm30refused7.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.713, -3.3007).