Liddeston Ridge Solar Park (Milford Haven) (5 MW)
Liddeston Ridge Solar Park (Milford Haven) is a 5 MW solar farm project in Pembrokeshire, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 31 March 2014; the record was last updated on 29 September 2015.
5 MWsolar farm
operationalstatus in REPD
29 September 2015record last updated
Pembrokeshirecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 2 October 2012 | Application submitted |
| 24 January 2013 | Planning permission granted |
| 13 November 2013 | Construction started |
| 31 March 2014 | Operational |
Project details
- Technology
- solar farm
- Capacity
- 5 MW
- Status (REPD)
- operational
- Record last updated
- 29 September 2015
- Operator or applicant
- Milford Haven Port Authority
- Planning authority
- Pembrokeshire
- Planning application reference
- 12/0614/PA
- Site area
- 12.3 ha
- Address (REPD)
- The S/E/O Court Road, Liddeston, Milford Haven, Dyfed
- Council area (by location)
- Pembrokeshire
- Time to decision
- 16 weeks
- REPD reference
- 1634
Who decides
| Applications | Pembrokeshire | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 61 | 10,236 |
| Refused | 13 (21%) | 19% |
| Solar refused | 1 of 31 | 12% |
| Onshore wind refused | 11 of 16 | 45% |
| Battery storage refused | 1 of 14 | 16% |
| Median time from submission to decision | 23.9 weeks | 17.0 weeks |
| Appeals lodged / allowed | 2 / 3 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Dragon Long Meadow Solar farm | solar farm | 9.9 | operational | 3.3 |
| Tiers Cross Solar Farm | solar farm | 24 | operational | 3.4 |
| Wear Point | wind farm | 8.2 | operational | 3.7 |
| Dragon Energy Park Wind Farm | wind farm | 14.4 | under construction | 3.9 |
| Rhoscrowther - Turbine Wind Farm | wind farm | 12.9 | refused | 4.2 |
| Pembroke Power Station, Pwllcrochan | battery storage | 350 | approved, not built | 5.3 |
| Wogaston Solar Farm | solar farm | 5.3 | operational | 5.8 |
| Hoplass Farm | solar farm | 10 | operational | 5.8 |
| The Greenlink Converter Station - Lambeeth Battery Energy Storage | battery storage | 49.9 | approved, not built | 6.2 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.7184, -5.0439).