Llandinam Windfarm Repowering and Extension (102 MW)

Llandinam Windfarm Repowering and Extension is a 102 MW wind farm project in Powys, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 7 September 2015, not yet built; the record was last updated on 25 June 2020. REPD also records that the planning permission expired on 7 September 2025, so the project may not go ahead in this form. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

102 MWwind farm
approved, not builtmay be out of datestatus in REPD
25 June 2020record last updated
Powyscouncil area

REPD also records that the planning permission expired on 7 September 2025, so the project may not go ahead in this form.

Planning timeline

DateStage
8 May 2008Application submitted
7 September 2015Planning permission granted
7 September 2025Permission expired

Project details

Technology
wind farm
Capacity
102 MW
Status (REPD)
approved, not built
Record last updated
25 June 2020
Operator or applicant
Scottish Power (formerly CeltPower Ltd/Eurus Energy)
Planning authority
Powys
Planning application reference
not recorded
Turbines
34
Address (REPD)
10km south of Newtown,
Council area (by location)
Powys
Time to decision
383 weeks
REPD reference
3983

Who decides

ApplicationsPowysUK
Decided applications (solar, wind, battery)4210,236
Refused15 (36%)19%
Solar refused2 of 1512%
Onshore wind refused12 of 2445%
Battery storage refused1 of 316%
Median time from submission to decision78.6 weeks17.0 weeks
Appeals lodged / allowed5 / 3—

UK: all UK planning authorities. Counted under these REPD planning authority names: DECC (S36), Powys.

Other large projects within 10 km

ProjectTypeMWStatuskm
Llandinam Windfarmwind farm31operational0.7
Garn Fach Wind Farmwind farm85approved, not built4.1
Hirddywelwind farm27application submitted4.1
Hirddywell Windfarmwind farm14.8application withdrawn4.2
Fferm Wynt Llaithddu Cyfwind farm66.7refused4.2
Neuadd Goch Bank Wind Farmwind farm27appeal withdrawn5.3
Llanbadarn Fynydd Wind Farmwind farm51refused6.4

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.446, -3.4227).