Hirddywel (27 MW wind farm)

Hirddywel is a 27 MW wind farm project in Powys, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 25 June 2010, no decision recorded; the record was last updated on 30 October 2017. The application was submitted more than two years ago and is still shown as pending; it may have been decided since. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

27 MWwind farm
application submittedmay be out of datestatus in REPD
30 October 2017record last updated
Powyscouncil area

The application was submitted more than two years ago and is still shown as pending; it may have been decided since. 32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided.

Planning timeline

DateStage
25 June 2010Application submitted

Project details

Technology
wind farm
Capacity
27 MW
Status (REPD)
application submitted
Record last updated
30 October 2017
Operator or applicant
Vattenfall
Planning authority
Powys
Planning application reference
P/2010/0650
Turbines
9
Address (REPD)
6.5km to south east of Llanidloes, Powys
Council area (by location)
Powys
REPD reference
4181

Who decides

ApplicationsPowysUK
Decided applications (solar, wind, battery)4210,236
Refused15 (36%)19%
Solar refused2 of 1512%
Onshore wind refused12 of 2445%
Battery storage refused1 of 316%
Median time from submission to decision78.6 weeks17.0 weeks
Appeals lodged / allowed5 / 3—

UK: all UK planning authorities. Counted under these REPD planning authority names: DECC (S36), Powys.

Other large projects within 10 km

ProjectTypeMWStatuskm
Hirddywell Windfarmwind farm14.8application withdrawn1.3
Fferm Wynt Llaithddu Cyfwind farm66.7refused3.0
Llandinam Windfarmwind farm31operational3.5
Garn Fach Wind Farmwind farm85approved, not built4.0
Llandinam Windfarm Repowering and Extensionwind farm102approved, not built4.1
Neuadd Goch Bank Wind Farmwind farm27appeal withdrawn8.3
Llanbadarn Fynydd Wind Farmwind farm51refused8.3
Bryn titli Windfarmwind farm9.9operational9.2
Bryn Blaen Wind Farmwind farm13.8operational9.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.4139, -3.4531).