Lockleaze Energy Storage (15 MW)

Lockleaze Energy Storage is a 15 MW battery storage project in Bristol, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 1 December 2017; the record was last updated on 31 January 2019.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

15 MWbattery storage
operationalstatus in REPD
31 January 2019record last updated
Bristolcouncil area

Planning timeline

DateStage
10 March 2017Application submitted
1 June 2017Construction started
1 December 2017Operational

Project details

Technology
battery storage (stand-alone storage)
Capacity
15 MW
Status (REPD)
operational
Record last updated
31 January 2019
Operator or applicant
Aura Power
Planning authority
Bristol, City of
Planning application reference
17/01147/F
Address (REPD)
Land at the SWEB Estate, Romney Avenue, Lockleaze, Bristol
Council area (by location)
Bristol
REPD reference
6961

Who decides

ApplicationsBristolUK
Decided applications (solar, wind, battery)3210,236
Refused0 (0%)19%
Solar refused0 of 1812%
Onshore wind refused0 of 645%
Battery storage refused0 of 816%
Median time from submission to decision14.1 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Philip Street Car Breakersbattery storage7.2approved, not built4.1
Feeder Roadbattery storage20operational4.2
Partfield Farmwind farm5.6application withdrawn5.0
Hammond Court Farmsolar farm15operational6.6
Oakham Farmsolar farm8operational6.8
Grange Farm (Avon)solar farm21operational7.0
Severn Roadbattery storage32operational7.2
Emergency Air Operation Base, Gloucester Roadsolar farm6application submitted7.5
Haberfield Park Farm Solar Farmsolar farm5approved, not built7.6

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.4849, -2.5716).