Morris Fen (Wind) (16 MW)

Morris Fen (Wind) is a 16 MW wind farm project in Peterborough, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 23 April 2004; the record was last updated on 30 May 2009.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

16 MWwind farm
refusedstatus in REPD
30 May 2009record last updated
Peterboroughcouncil area

Planning timeline

DateStage
5 September 2003Application submitted
23 April 2004Refused by the planning authority

Project details

Technology
wind farm
Capacity
16 MW
Status (REPD)
refused
Record last updated
30 May 2009
Operator or applicant
Wind Prospect
Planning authority
Peterborough
Planning application reference
03/01247/FUL
Address (REPD)
Morris Fen , Near Thorney (NEE) , Peterborough
Council area (by location)
Peterborough
Time to decision
33 weeks
REPD reference
3178

Who decides

ApplicationsPeterboroughUK
Decided applications (solar, wind, battery)3510,236
Refused6 (17%)19%
Solar refused0 of 1912%
Onshore wind refused6 of 645%
Battery storage refused0 of 1016%
Median time from submission to decision12.9 weeks17.0 weeks
Appeals lodged / allowed1 / 3—

Other large projects within 10 km

ProjectTypeMWStatuskm
Morris Fen (PV)solar farm27application withdrawn2.0
Nutsgrove Farm, Thorneysolar farm49.9approved, not built3.3
Nutsgrove Wind Farmwind farm14.4abandoned3.3
Wryde Croftwind farm26operational3.7
Gores Wind Farmwind farm16application withdrawn4.4
French Farm 2 (Extension)wind farm8refused4.5
Malice Farm, French Drovebattery storage49.9approved, not built5.2
Malice Farm, French Drove Solar Farmsolar farm49.9approved, not built5.2
Willow Hall Farmwind farm10application withdrawn5.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.6272, -0.0808).