Energy Projects Near You

Neslam Wind Farm (12 MW)

Neslam Wind Farm is a 12 MW wind farm project in South Kesteven, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 16 September 2009; the record was last updated on 2 November 2010.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

12 MWwind farm
application withdrawnstatus in REPD
2 November 2010record last updated
South Kestevencouncil area

Planning timeline

DateStage
3 February 2009Application submitted
16 September 2009Application withdrawn

Project details

Technology
wind farm
Capacity
12 MW
Status (REPD)
application withdrawn
Record last updated
2 November 2010
Operator or applicant
Cumbria Wind Farms
Planning authority
South Kesteven
Planning application reference
S09/0296
Turbines
6
Address (REPD)
Sempringham Fen, Sleaford
Council area (by location)
South Kesteven
REPD reference
2714

Who decides

ApplicationsSouth KestevenUK
Decided applications (solar, wind, battery)4010,236
Refused14 (35%)19%
Solar refused9 of 3112%
Onshore wind refused4 of 445%
Battery storage refused1 of 516%
Median time from submission to decision15.0 weeks17.0 weeks
Appeals lodged / allowed3 / 5—

Other large projects within 10 km

ProjectTypeMWStatuskm
Cowbridge Road, Bicker Fensolar farm75under construction6.8
Vicarage Drove Solar farm & Battery storagesolar farm49.9approved, not built6.9
Little Hale Fen Solar Farmsolar farm50approved, not built7.0
Washdyke Farm, Billingborough Road Solar farmsolar farm27approved, not built7.2
Little Hale Drove, Little Hale Fenbattery storage99approved, not built7.5
Bicker Fen Bess, Vicarage Drovebattery storage400approved, not built7.7
Bicker Fenwind farm26.7operational7.7
Bicker Drovebattery storage100approved, not built8.5
White Gorse Farmsolar farm11.6permission expired8.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.8818, -0.2859).