Pontefract Wind Farm (12 MW)

Pontefract Wind Farm is a 12 MW wind farm project in Wakefield, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on appeal on 22 June 2010; the record was last updated on 7 December 2010.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

12 MWwind farm
refused on appealstatus in REPD
7 December 2010record last updated
Wakefieldcouncil area

Planning timeline

DateStage
3 May 2007Application submitted
1 February 2008Refused by the planning authority
22 June 2010Appeal refused

Project details

Technology
wind farm
Capacity
12 MW
Status (REPD)
refused on appeal
Record last updated
7 December 2010
Operator or applicant
Banks Development
Planning authority
Wakefield
Planning application reference
07/01338/FUL
Appeal reference
09/00024/REF
Turbines
6
Address (REPD)
Went Edge, South Pontefract
Council area (by location)
Wakefield
Time to decision
39 weeks
REPD reference
3455

Who decides

ApplicationsWakefieldUK
Decided applications (solar, wind, battery)4510,236
Refused7 (16%)19%
Solar refused5 of 3612%
Onshore wind refused1 of 145%
Battery storage refused1 of 816%
Median time from submission to decision9.0 weeks17.0 weeks
Appeals lodged / allowed3 / 3—

Other large projects within 10 km

ProjectTypeMWStatuskm
Darrington Quarrywind farm16application withdrawn2.9
Kirkhaw Lanebattery storage100abandoned4.1
Kirkhaw Lanebattery storage20operational4.1
Kirkhaw Lane Battery Storage Energybattery storage150operational4.4
Knottingley Asolar farm5operational4.9
Leys Lanesolar farm49.9application submitted5.3
Cooksland Farm, Old Snydale -Battery Energy Storagebattery storage50approved, not built5.5
Rawfield Lanebattery storage200approved, not built7.0
Newton Lane, Ledstonbattery storage25approved, not built7.2

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.688, -1.3125).