Solar Farm at Cossans Solar Farm (49.9 MW)

Solar Farm at Cossans Solar Farm is a 49.9 MW solar farm project in Angus, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 15 May 2025, no decision recorded; the record was last updated on 1 July 2025. As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

49.9 MWsolar farm
application submittedstatus in REPD
1 July 2025record last updated
Anguscouncil area

Planning timeline

DateStage
15 May 2025Application submitted

Project details

Technology
solar farm
Capacity
49.9 MW
Status (REPD)
application submitted
Record last updated
1 July 2025
Operator or applicant
BLC Energy
Planning authority
Scottish Government (S36)
Planning application reference
ECU00005213
Site area
87.0 ha
Address (REPD)
Cossans Solar Farm, Haugh of Cossans, Forfar
Council area (by location)
Angus
Name in REPD
Cossans Solar Farm - Solar Farm
REPD reference
18982

Recorded together with Cossans Solar Farm -ESS (35 MW battery storage, application submitted).

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. Scottish Government (S36) refused 18% of 334 decided solar, wind and battery applications in REPD (median 127 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Dragonhall Farm, Padanaramsolar farm5under construction3.2
Orchardbank Industrial Estatebattery storage10permission expired3.8
Newfordpark House, Glamis Roadrooftop solar6.7approved, not built4.1
Land East of Sandyfordsolar farm5permission expired5.2
Hanna Wind Farmwind farm81abandoned5.7
Mile Hillwind farm13.8application withdrawn5.7
Craignathro Farmsolar farm6.5approved, not built5.8
Carseview Roadbattery storage49.9approved, not built6.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (56.6333, -2.9748).