Spring Farm (wind) (6 MW)
Spring Farm (wind) is a 6 MW wind farm project in East Staffordshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 4 December 2008; the record was last updated on 4 December 2008.
6 MWwind farm
application withdrawnstatus in REPD
4 December 2008record last updated
East Staffordshirecouncil area
Planning timeline
| Date | Stage |
|---|---|
| 4 December 2008 | Application withdrawn |
Project details
- Technology
- wind farm
- Capacity
- 6 MW
- Status (REPD)
- application withdrawn
- Record last updated
- 4 December 2008
- Operator or applicant
- Ecotricity
- Planning authority
- East Staffordshire
- Planning application reference
- not recorded
- Turbines
- 3
- Address (REPD)
- Spring Farm Bramshall
- Council area (by location)
- East Staffordshire
- REPD reference
- 3209
Who decides
| Applications | East Staffordshire | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 21 | 10,236 |
| Refused | 1 (5%) | 19% |
| Solar refused | 0 of 19 | 12% |
| Onshore wind refused | 1 of 1 | 45% |
| Battery storage refused | 0 of 1 | 16% |
| Median time from submission to decision | 11.7 weeks | 17.0 weeks |
| Appeals lodged / allowed | 0 / 0 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Solar farm at land at The Willows, Uttoxeter | solar farm | 6.4 | operational | 5.0 |
| Bagot's Park | wind farm | 18.4 | refused | 6.2 |
| Upper Leigh | battery storage | 20 | application submitted | 6.4 |
| Yew Tree Farm, Drointon Lane | solar farm | 49 | application submitted | 6.7 |
| Woodhouse Fields Farm | solar farm | 5 | operational | 6.7 |
| Twin Oaks Farm | solar farm | 5 | abandoned | 6.8 |
| Tean Leys Farm, Tean Leys | battery storage | 70 | application submitted | 7.0 |
| Lower Farm, Drointon Lane Solar farm & Battery Energy Storage | solar farm | 49.9 | approved, not built | 7.0 |
| Upper Leigh Solar Farm | solar farm | 49.9 | approved, not built | 7.0 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.8953, -1.915).