Stephenson Road - Urban Reserve Flexible Energy Facility (6 MW battery storage)

Stephenson Road - Urban Reserve Flexible Energy Facility is a 6 MW battery storage project in Colchester, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: approved on 28 October 2022, not yet built; the record was last updated on 27 May 2022. REPD also records that the planning permission expired on 28 October 2025, so the project may not go ahead in this form. Check the planning authority's register for the latest position.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

6 MWbattery storage
approved, not builtmay be out of datestatus in REPD
27 May 2022record last updated
Colchestercouncil area

REPD also records that the planning permission expired on 28 October 2025, so the project may not go ahead in this form.

Planning timeline

DateStage
11 May 2022Application submitted
28 October 2022Planning permission granted
28 October 2025Permission expired

Project details

Technology
battery storage (stand-alone storage)
Capacity
6 MW
Status (REPD)
approved, not built
Record last updated
27 May 2022
Operator or applicant
AMP Energy Services LImited
Planning authority
Colchester
Planning application reference
221033
Address (REPD)
C P S House, Stephenson Road, Colchester
Council area (by location)
Colchester
Time to decision
24 weeks
REPD reference
11362

Who decides

ApplicationsColchesterUK
Decided applications (solar, wind, battery)2410,236
Refused2 (8%)19%
Solar refused1 of 1912%
Battery storage refused1 of 516%
Median time from submission to decision13.3 weeks17.0 weeks
Appeals lodged / allowed2 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Boxted Airfieldsolar farm18.8operational2.4
Chancery Farm (Ardleigh)solar farm11.9operational4.4
Boxtedsolar farm20application submitted4.7
Ardleigh Road, Little Bromleybattery storage50approved, not built5.8
Bluegates Solar Parksolar farm10.5operational8.4
Holmwood Solar Farmsolar farm19refused on appeal9.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.9211, 0.9324).