Warrington Home Solar Scheme (5.3 MW)

Warrington Home Solar Scheme is a 5.3 MW rooftop solar project in Warrington, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 1 January 2016; the record was last updated on 28 July 2016.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

5.3 MWrooftop solar
operationalstatus in REPD
28 July 2016record last updated
Warringtoncouncil area

Planning timeline

DateStage
1 August 2014Construction started
1 January 2016Operational

Project details

Technology
rooftop solar
Capacity
5.3 MW
Status (REPD)
operational
Record last updated
28 July 2016
Operator or applicant
Warrington Council
Planning authority
Warrington
Planning application reference
not recorded
Address (REPD)
Warrington
Council area (by location)
Warrington
REPD reference
1892

Who decides

ApplicationsWarringtonUK
Decided applications (solar, wind, battery)3510,236
Refused6 (17%)19%
Solar refused5 of 3012%
Onshore wind refused0 of 145%
Battery storage refused1 of 416%
Median time from submission to decision7.9 weeks17.0 weeks
Appeals lodged / allowed0 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Land south of 50 Station Roadsolar farm5refused3.3
Station Road, Fiddlers Ferrybattery storage250refused4.2
The Hut Group, Skyline Driverooftop solar6.8approved, not built4.6
Land South Of Joy Lanesolar farm5refused4.9
Fiddlers Ferry Power Stationbattery storage150under construction5.9
Mowcroft Solar Farmsolar farm27.1refused5.9
Kenyon Lanesolar farm5refused8.7
Silver Lane, Risley Solar Farmsolar farm5approved, not built8.7
Sutton Manorbattery storage57approved, not built9.7

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (53.3873, -2.6029).