Werfa Wind Farm (14.3 MW)

Werfa Wind Farm is a 14.3 MW wind farm project in Bridgend, Wales. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on 19 March 2002; the record was last updated on 8 October 2013.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

14.3 MWwind farm
refusedstatus in REPD
8 October 2013record last updated
Bridgendcouncil area

Planning timeline

DateStage
28 September 2001Application submitted
19 March 2002Refused by the planning authority

Project details

Technology
wind farm
Capacity
14.3 MW
Status (REPD)
refused
Record last updated
8 October 2013
Operator or applicant
Amec Wind
Planning authority
Bridgend
Planning application reference
01/887/FUL
Address (REPD)
Werfa, Bridgend
Council area (by location)
Bridgend
Time to decision
25 weeks
REPD reference
3080

Who decides

ApplicationsBridgendUK
Decided applications (solar, wind, battery)1910,236
Refused7 (37%)19%
Solar refused1 of 812%
Onshore wind refused6 of 1045%
Battery storage refused0 of 116%
Median time from submission to decision23.7 weeks17.0 weeks
Appeals lodged / allowed1 / 3—

Other large projects within 10 km

ProjectTypeMWStatuskm
Ogmore & Garwwind farm12refused0.6
Werfawind farm47.5refused on appeal1.4
Upper Ogmore Wind Farmwind farm25.2approved, not built2.6
Llynfi Afan Renewable Energy Parkwind farm6operational2.6
Llynfi Renewable Energy Park, Land at Mynydd Caerauwind farm24operational3.1
Pant y Wal (Extension)wind farm5approved, not built5.1
Foel Fawrsolar farm5.1permission expired5.3
Ffynnon Oer Wind Farmwind farm32operational5.7
Pant y walwind farm25operational6.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.6432, -3.5767).