Solar, wind and battery projects near Belvedere (DA17)
89 solar, wind or battery projects of 150 kW or more are recorded within 10 km of the centre of DA17 (Bexley): 7 are waiting for a planning decision, 62 approved but not yet running, 9 operational. The largest live scheme is Manor Farm, Dartford Road (212 MW battery storage, application submitted on 5 June 2025, no decision recorded), 5.2 km away. Source: Renewable Energy Planning Database, July 2026 extract.
Projects within 10 km of DA17
Projects of 1 MW and more (25)
| Project | Type | MW | Status (REPD) | Submitted | Decision | Record updated | Council | km |
|---|---|---|---|---|---|---|---|---|
| Crossness Sewage Works Turbinewind turbine | wind turbine | 2.5 | operationalupdated Jan 2015 | Nov 2010 | granted Dec 2010 | Jan 2015 | Bexley | 1.8 |
| Riverside Energy Parkbattery storage | battery storage | 20 | approved, not built may be out of dateupdated Apr 2022 | Nov 2018 | granted Apr 2020 | Apr 2022 | Bexley | 2.0 |
| Riverside Energy Park (REP)rooftop solar | rooftop solar | 1 | approved, not built may be out of dateupdated Sep 2020 | Nov 2018 | granted Apr 2020 | Sep 2020 | Bexley | 2.0 |
| Riverside Resource Recovery Facility Battery Storagebattery storage | battery storage | 2.5 | under constructionupdated Jan 2021 | Dec 2020 | — | Jan 2021 | Bexley | 2.1 |
| Crossness Sewage Works PVrooftop solar | rooftop solar | 1.5 | operationalupdated Jan 2012 | — | — | Jan 2012 | Bexley | 2.5 |
| Ford Wind Park - Dagenhamwind farm | wind farm | 5.9 | operationalupdated Aug 2011 | Mar 2003 | granted Jul 2003 | Aug 2011 | Barking and Dagenham | 3.6 |
| Atcost Roadbattery storage | battery storage | 100 | application submitted may be out of dateupdated May 2024 | May 2024 | — | May 2024 | Barking and Dagenham | 4.6 |
| Ford Motor Company Ltd (Extension)wind turbine | wind turbine | 2 | operationalupdated Sep 2011 | Apr 2009 | granted Jul 2009 | Sep 2011 | Barking and Dagenham | 4.7 |
| Manor Farm, Dartford Roadbattery storage | battery storage | 212 | application submittedupdated Jul 2025 | Jun 2025 | — | Jul 2025 | Bexley | 5.2 |
| Ocado Operating Limited, New Purfleet Roadrooftop solar | rooftop solar | 2.8 | approved, not builtupdated May 2025 | Mar 2025 | granted May 2025 | May 2025 | Thurrock | 6.0 |
| Aveley Landfill, Sandy Lane PV Solar Array & Battery Energy Storagesolar farm | solar farm | 16 | approved, not builtupdated Feb 2025 | Feb 2024 | granted Jul 2024 | Feb 2025 | Thurrock | 6.4 |
| Beckton Sewage Treatment Workswind farm | wind farm | 2.2 | operationalupdated Feb 2015 | — | — | Feb 2015 | Newham | 6.5 |
| Queen Elizabeth Hospital, Stadium Roadrooftop solar | rooftop solar | 1.6 | refusedupdated Dec 2025 | Oct 2025 | refused Nov 2025 | Dec 2025 | Greenwich | 6.9 |
| North Cray Roadbattery storage | battery storage | 200 | refusedupdated Jan 2026 | Apr 2025 | refused Oct 2025 | Jan 2026 | Bexley | 7.4 |
| Albion Roadbattery storage | battery storage | 5 | application withdrawnupdated Jun 2020 | Jul 2019 | — | Jun 2020 | Dartford | 7.6 |
| Littlebrook Battery Storagebattery storage | battery storage | 7.5 | operationalupdated Feb 2026 | Jul 2016 | granted Sep 2016 | Feb 2026 | Dartford | 7.6 |
| Neatscourtbattery storage | battery storage | 1 | abandonedupdated Jun 2020 | Jun 2017 | — | Jun 2020 | Dartford | 8.2 |
| Darenth Roadbattery storage | battery storage | 99.9 | approved, not builtupdated Oct 2025 | May 2025 | granted Oct 2025 | Oct 2025 | Dartford | 8.3 |
| Land Adjacent Davanden Kennelsbattery storage | battery storage | 7.5 | abandonedupdated Feb 2020 | May 2018 | — | Feb 2020 | Dartford | 8.3 |
| Thameside DCrooftop solar | rooftop solar | 1 | operationalupdated Feb 2016 | — | — | Feb 2016 | Greenwich | 8.5 |
| Tesco, Cygnet View Solar PV Arraysrooftop solar | rooftop solar | 1.1 | approved, not builtupdated Apr 2026 | Jan 2026 | granted Mar 2026 | Apr 2026 | Thurrock | 8.8 |
| Bean Lanebattery storage | battery storage | 104 | application withdrawnupdated Jan 2026 | Apr 2025 | — | Jan 2026 | Dartford | 9.3 |
| Intu Lakeside, West Thurrock Wayrooftop solar | rooftop solar | 1.3 | approved, not builtupdated Sep 2024 | Jul 2024 | granted Sep 2024 | Sep 2024 | Thurrock | 9.3 |
| Little Belhus Restoration Sitewind farm | wind farm | 1 | operationalupdated Jan 2017 | Nov 2013 | granted May 2015 | Jan 2017 | Thurrock | 9.8 |
| Alcatel, Telegraph Houserooftop solar | rooftop solar | 1.3 | refusedupdated Dec 2025 | Sep 2025 | refused Oct 2025 | Dec 2025 | Greenwich | 9.8 |
Smaller schemes under 1 MW, mostly rooftop solar (60)
| Project | Type | MW | Status (REPD) | Submitted | Decision | Record updated | Council | km |
|---|---|---|---|---|---|---|---|---|
| Thames Innovation Centre, Veridion Wayrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Sep 2025 | May 2025 | granted Jul 2025 | Sep 2025 | Bexley | 1.1 |
| James Watt Wayrooftop solar | rooftop solar | 0.6 | approved, not builtupdated Nov 2021 | Nov 2021 | granted Jan 2022 | Nov 2021 | Bexley | 2.6 |
| The Mallrooftop solar | rooftop solar | — | approved, not builtupdated Mar 2026 | Nov 2025 | granted Jan 2026 | Mar 2026 | Bexley | 3.4 |
| Bexleyheath Superbowl, Albion Roadrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Oct 2023 | Aug 2023 | granted Oct 2023 | Oct 2023 | Bexley | 3.5 |
| Twin Tumps Wayrooftop solar | rooftop solar | 0.6 | operationalupdated Mar 2022 | Feb 2022 | granted Dec 2022 | Mar 2022 | Greenwich | 3.8 |
| Ceme Campus, Marsh Wayrooftop solar | rooftop solar | 0.9 | approved, not builtupdated May 2023 | Feb 2023 | granted Apr 2023 | May 2023 | Havering | 3.9 |
| Thames Gateway Park, Choats Roadrooftop solar | rooftop solar | 0.5 | approved, not builtupdated Jun 2023 | May 2023 | granted Jun 2023 | Jun 2023 | Barking and Dagenham | 4.2 |
| JJ Food Service, Orion Park Messina Wayrooftop solar | rooftop solar | 0.6 | approved, not builtupdated Oct 2023 | Oct 2023 | granted Nov 2023 | Oct 2023 | Barking and Dagenham | 4.7 |
| Pooles Lanerooftop solar | rooftop solar | 0.3 | approved, not builtupdated Nov 2025 | Jul 2025 | granted Aug 2025 | Nov 2025 | Barking and Dagenham | 4.7 |
| The I O Centre, Skeffington Streetrooftop solar | rooftop solar | 0.2 | refusedupdated Feb 2026 | Nov 2025 | refused Jan 2026 | Feb 2026 | Greenwich | 5.1 |
| Nic Ice, Thames Roadrooftop solar | rooftop solar | — | approved, not builtupdated Jan 2025 | Nov 2024 | granted Dec 2024 | Jan 2025 | Barking and Dagenham | 5.2 |
| Goresbrook School, Cook Roadrooftop solar | rooftop solar | 0.4 | approved, not builtupdated Jun 2026 | Mar 2026 | granted May 2026 | Jun 2026 | Barking and Dagenham | 5.3 |
| Atlantis Avenue, Beckton Solar PV Systemsrooftop solar | rooftop solar | 0.4 | approved, not builtupdated Jun 2023 | Apr 2023 | granted Jun 2023 | Jun 2023 | Newham | 5.6 |
| Brookhill Estate Regenerationrooftop solar | rooftop solar | 0.1 | approved, not built may be out of dateupdated May 2022 | Apr 2022 | granted Mar 2023 | May 2022 | Greenwich | 5.8 |
| Manor Joinery Estate, Eastern Approach Alfreds Wayrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Mar 2023 | Dec 2022 | granted Feb 2023 | Mar 2023 | Barking and Dagenham | 5.8 |
| Dartford Grammar School For Boys, West Hillrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Sep 2024 | Jul 2024 | granted Sep 2024 | Sep 2024 | Dartford | 6.0 |
| Dagenham Motors, Ripple Roadrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jun 2023 | May 2023 | granted Jun 2023 | Jun 2023 | Barking and Dagenham | 6.0 |
| Northern Gateway Distribution Centre, Central Road Northrooftop solar | rooftop solar | 0.8 | approved, not builtupdated Jan 2024 | Nov 2023 | granted Jan 2024 | Jan 2024 | Dartford | 6.0 |
| Northern Gateway Distribution Centre,Central Road Northrooftop solar | rooftop solar | 0.6 | application submitted | Jun 2026 | — | — | Dartford | 6.2 |
| University Of East London Dockland Campus, University Way - Soalr Panelsrooftop solar | rooftop solar | — | approved, not builtupdated Jan 2024 | Oct 2023 | granted Dec 2023 | Jan 2024 | Newham | 6.3 |
| One Hundred House, Brunel Wayrooftop solar | rooftop solar | 0.8 | approved, not builtupdated Aug 2023 | Jul 2023 | granted Aug 2023 | Aug 2023 | Dartford | 6.3 |
| London Design and Engineering UTC, University Waywind farm | wind farm | 0.2 | application submitted | May 2026 | — | — | Newham | 6.4 |
| Aveley Landfill, Sandy Lane PV Solar Array & Battery Energy Storagebattery storage | battery storage | — | approved, not builtupdated Feb 2025 | Feb 2024 | granted Jul 2024 | Feb 2025 | Thurrock | 6.4 |
| Knowledge Dock, University Wayrooftop solar | rooftop solar | 0.1 | approved, not builtupdated Sep 2023 | Jul 2023 | granted Sep 2023 | Sep 2023 | Newham | 6.4 |
| Avery Hill Campus, Avery Hill Roadrooftop solar | rooftop solar | 0.5 | approved, not builtupdated May 2026 | Feb 2026 | granted Mar 2026 | May 2026 | Greenwich | 6.5 |
| Circular 13, Unit B, Gascoigne Roadrooftop solar | rooftop solar | 1 | approved, not builtupdated Jun 2023 | Apr 2023 | granted Jun 2023 | Jun 2023 | Barking and Dagenham | 6.6 |
| Hunters Hall Primary School, Alibon Roadrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jul 2024 | May 2024 | granted Jul 2024 | Jul 2024 | Barking and Dagenham | 6.8 |
| New England Industrial Estate Developmentrooftop solar | rooftop solar | 0.2 | under constructionupdated May 2023 | Mar 2021 | granted Sep 2021 | May 2023 | Barking and Dagenham | 6.8 |
| Sainsbury, Claps Gate Lanerooftop solar | rooftop solar | 0.4 | application submitted | May 2026 | — | — | Newham | 6.9 |
| Littlebrook DC1, Shield Roadrooftop solar | rooftop solar | 0.6 | approved, not builtupdated Jul 2025 | May 2025 | granted Jul 2025 | Jul 2025 | Dartford | 7.1 |
| Fairfield Pool, Lowfield Streetrooftop solar | rooftop solar | 0.4 | approved, not builtupdated Oct 2023 | Jul 2023 | granted Oct 2023 | Oct 2023 | Dartford | 7.1 |
| Fairfield Centre, Lowfield Streetrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Oct 2023 | Aug 2023 | granted Oct 2023 | Oct 2023 | Dartford | 7.1 |
| Siemens Roadrooftop solar | rooftop solar | 0.7 | refusedupdated Jun 2023 | Apr 2023 | refused Jun 2023 | Jun 2023 | Greenwich | 7.4 |
| Siemens Road, Westminster Industrial Estaterooftop solar | rooftop solar | 0.7 | approved, not builtupdated Aug 2023 | Jun 2023 | granted Aug 2023 | Aug 2023 | Greenwich | 7.4 |
| Siemens Road, Westminster Industrial Estaterooftop solar | rooftop solar | 0.7 | approved, not builtupdated Aug 2023 | Jun 2023 | granted Aug 2023 | Aug 2023 | Greenwich | 7.4 |
| Newham Dockside - Photovoltaic Panelsrooftop solar | rooftop solar | 0.4 | approved, not builtupdated Mar 2022 | Jan 2022 | granted Mar 2022 | Mar 2022 | Newham | 7.4 |
| Swan Road, Westminster Industrial Estaterooftop solar | rooftop solar | 0.7 | refusedupdated Jun 2023 | Apr 2023 | refused Jun 2023 | Jun 2023 | Greenwich | 7.5 |
| David Lloyd Leisure, Baugh Roadrooftop solar | rooftop solar | — | approved, not builtupdated Jan 2026 | Jul 2025 | granted Sep 2025 | Jan 2026 | Bexley | 7.7 |
| Maidstone Roadrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Dec 2023 | Oct 2023 | granted Dec 2023 | Dec 2023 | Bexley | 7.7 |
| The Valley, Floyd Roadrooftop solar | rooftop solar | 0.7 | approved, not builtupdated Aug 2025 | Jun 2025 | granted Jul 2025 | Aug 2025 | Greenwich | 7.7 |
| DSV Road, Stonehouse Lanerooftop solar | rooftop solar | 0.3 | approved, not builtupdated Nov 2024 | Sep 2024 | granted Nov 2024 | Nov 2024 | Thurrock | 7.7 |
| David Lloyd Sports Centre, Darenth Road Solar Photo Voltaic Systemrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Jan 2024 | Nov 2023 | granted Jan 2024 | Jan 2024 | Dartford | 7.7 |
| Tesco Store Cygnet Viewrooftop solar | rooftop solar | 0.6 | approved, not builtupdated Sep 2020 | Mar 2019 | granted Apr 2019 | Sep 2020 | Thurrock | 7.8 |
| Littlebrook Hospital, Bow Arrow Lanerooftop solar | rooftop solar | — | approved, not builtupdated Jul 2026 | Apr 2026 | granted Jun 2026 | Jul 2026 | Dartford | 7.8 |
| Ellen Wilkinson School, Tollgate Road Solar PhotovoltaicPanelsrooftop solar | rooftop solar | 0.2 | approved, not builtupdated May 2024 | Jan 2024 | granted Apr 2024 | May 2024 | Newham | 7.9 |
| Stone Lake Retail Park, Woolwich Roadrooftop solar | rooftop solar | 0.1 | approved, not builtupdated Jun 2026 | Mar 2026 | granted May 2026 | Jun 2026 | Greenwich | 7.9 |
| Roman Road Primary School, Roman Roadrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Jul 2025 | May 2025 | granted Jul 2025 | Jul 2025 | Newham | 8.1 |
| Leyes Road - New SEN Schoolrooftop solar | rooftop solar | 0.2 | under constructionupdated Sep 2025 | Sep 2023 | granted Nov 2023 | Sep 2025 | Newham | 8.1 |
| Riverbridge House, Admirals Parkrooftop solar | rooftop solar | 0.3 | approved, not builtupdated Jul 2023 | May 2023 | granted Jul 2023 | Jul 2023 | Dartford | 8.2 |
| Ford Retail, Triton Centre Weston Avenuerooftop solar | rooftop solar | 0.8 | approved, not builtupdated Jan 2023 | Nov 2022 | granted Jan 2023 | Jan 2023 | Thurrock | 8.3 |
| Barking And Dagenham College, Dagenham Roadrooftop solar | rooftop solar | 0.8 | approved, not builtupdated Jun 2025 | Mar 2025 | granted May 2025 | Jun 2025 | Barking and Dagenham | 8.4 |
| Barking & Dagenham College Of Technology, Dagenham Road Solarrooftop solar | rooftop solar | — | no application requiredupdated May 2025 | Apr 2025 | — | May 2025 | Barking and Dagenham | 8.4 |
| Tesco Stores Limited, Edgington Wayrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Dec 2025 | Oct 2025 | granted Nov 2025 | Dec 2025 | Bromley | 8.5 |
| Princes Roadrooftop solar | rooftop solar | 0.1 | approved, not builtupdated Jan 2023 | Nov 2022 | granted Jan 2023 | Jan 2023 | Dartford | 8.6 |
| Newham Leisure Centre, Prince Regent Lanerooftop solar | rooftop solar | 0.2 | application submitted may be out of dateupdated Feb 2023 | Dec 2022 | — | Feb 2023 | Newham | 8.8 |
| Newham University Hospital, Glen Roadrooftop solar | rooftop solar | 0.8 | approved, not builtupdated May 2026 | Jan 2026 | granted Mar 2026 | May 2026 | Newham | 8.9 |
| Pumping Station, West Thurrock Way - Micro Energy Storagebattery storage | battery storage | 0.2 | approved, not builtupdated Nov 2024 | Sep 2024 | granted Oct 2024 | Nov 2024 | Thurrock | 8.9 |
| David Lloyd Leisure Limited, Corner Of Weigall Roadrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Sep 2023 | Jul 2023 | granted Sep 2023 | Sep 2023 | Greenwich | 9.0 |
| Custom Housebattery storage | battery storage | 0.2 | approved, not builtupdated Sep 2025 | Feb 2025 | granted Aug 2025 | Sep 2025 | Newham | 9.1 |
| Plashet Schoolrooftop solar | rooftop solar | 0.2 | approved, not builtupdated Aug 2025 | May 2025 | granted Jul 2025 | Aug 2025 | Newham | 9.1 |
4 more projects not listed (furthest or smallest).
Distance from the average position of the DA17 postcodes, not from your home. Projects of 5 MW and more have their own page with dates and planning history.
By type
| Type | All | Pending | Approved | Operational | Refused | MW in pipeline |
|---|---|---|---|---|---|---|
| Solar farm | 1 | 0 | 1 | 0 | 0 | 16 |
| Rooftop solar | 67 | 4 | 54 | 3 | 5 | 26.6 |
| Wind farm | 4 | 1 | 0 | 3 | 0 | 0.2 |
| Wind turbine | 2 | 0 | 0 | 2 | 0 | 0 |
| Battery storage | 15 | 2 | 7 | 1 | 1 | 435 |
MW in pipeline: pending, approved and under-construction capacity.
How Bexley decides solar, wind and battery applications
Bexley has 8 decided solar, wind or battery applications in REPD — too few for a refusal rate (we show one from 10 decisions). Across all UK planning authorities 19% of 10,236 decisions were refusals.
Is the status up to date?
32% of applications still shown as pending in REPD were submitted more than two years ago, and only 37% of pending records were updated in the last 12 months, so some of them may already have been decided. Near DA17, 6 projects have a status that may be out of date (pending for over two years, or approved with a permission expiry date already passed). Check the council's planning register for the latest decision.