Allt Dearg Wind Farmers LLP (10.8 MW)

Allt Dearg Wind Farmers LLP is a 10.8 MW wind farm project in Argyll and Bute, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: operational since 25 September 2012; the record was last updated on 26 February 2013.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

10.8 MWwind farm
operationalstatus in REPD
26 February 2013record last updated
Argyll and Butecouncil area

Planning timeline

DateStage
17 January 2011Application submitted
5 April 2011Planning permission granted
1 December 2011Construction started
25 September 2012Operational

Project details

Technology
wind farm
Capacity
10.8 MW
Status (REPD)
operational
Record last updated
26 February 2013
Operator or applicant
Ormsary and Stronachullin Estates (Allt Dearg Wind Farmers LLP)
Planning authority
Argyll and Bute
Planning application reference
10/02151/PP
Turbines
12
Address (REPD)
Cruach a'Phubuill, 9km south of Ardishaig, South Knapdale, Argyll
Council area (by location)
Argyll and Bute
Time to decision
11 weeks
REPD reference
3758

Who decides

ApplicationsArgyll and ButeUK
Decided applications (solar, wind, battery)4910,236
Refused22 (45%)19%
Solar refused0 of 412%
Onshore wind refused21 of 4145%
Battery storage refused1 of 416%
Median time from submission to decision53.3 weeks17.0 weeks
Appeals lodged / allowed5 / 4—

Other large projects within 10 km

ProjectTypeMWStatuskm
Srondoire Community Wind Farmwind farm6operational0.2
Alt Deargwind farm42refused1.5
Allt Rubha Wind Farmwind farm27application withdrawn5.4
High Brenfield Wind Farmwind farm66application submitted6.7
Cruach Brenfield Wind Farmwind farm59.4application withdrawn7.2
Shira Wind Farmwind farm79application withdrawn10.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.9334, -5.4774).