Shira Wind Farm (79 MW)

Shira Wind Farm is a 79 MW wind farm project in Argyll and Bute, Scotland. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 23 February 2012; the record was last updated on 7 August 2012. As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

79 MWwind farm
application withdrawnstatus in REPD
7 August 2012record last updated
Argyll and Butecouncil area

Planning timeline

DateStage
14 March 2006Application submitted
23 February 2012Application withdrawn

Project details

Technology
wind farm
Capacity
79 MW
Status (REPD)
application withdrawn
Record last updated
7 August 2012
Operator or applicant
Natural Power
Planning authority
Scottish Government (S36)
Planning application reference
06/00554/ELSA36
Turbines
36
Address (REPD)
South of Dalmally in Argyll and Bute
Council area (by location)
Argyll and Bute
REPD reference
4045

Who decides

As a project over 50 MW in Scotland, it is decided by Scottish Ministers under Section 36. Scottish Government (S36) refused 18% of 334 decided solar, wind and battery applications in REPD (median 127 weeks to a decision). Across all UK planning authorities 19% of 10,236 decided applications were refused.

Other large projects within 10 km

ProjectTypeMWStatuskm
Cruach Brenfield Wind Farmwind farm59.4application withdrawn2.8
Raera Forestwind farm48refused3.0
High Brenfield Wind Farmwind farm66application submitted3.8
Allt Rubha Wind Farmwind farm27application withdrawn5.2
Alt Deargwind farm42refused8.5
Srondoire Community Wind Farmwind farm6operational9.9
Allt Dearg Wind Farmers LLPwind farm10.8operational10.0

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (56.023, -5.4669).