Ancroft Northmoor Wind Farm (16 MW)

Ancroft Northmoor Wind Farm is a 16 MW wind farm project in Northumberland, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application withdrawn on 6 April 2011; the record was last updated on 6 April 2011.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

16 MWwind farm
application withdrawnstatus in REPD
6 April 2011record last updated
Northumberlandcouncil area

Planning timeline

DateStage
6 April 2011Application withdrawn
2 November 2011Application submitted

Project details

Technology
wind farm
Capacity
16 MW
Status (REPD)
application withdrawn
Record last updated
6 April 2011
Operator or applicant
E.ON UK
Planning authority
Northumberland
Planning application reference
C/09/00063/CCMEIA
Turbines
8
Address (REPD)
Southeast Of Ancroft Northmoor And Southwest Of Allerdean Grange Berwick-upon-Tweed Northumberland
Council area (by location)
Northumberland
REPD reference
3498

Who decides

ApplicationsNorthumberlandUK
Decided applications (solar, wind, battery)8210,236
Refused31 (38%)19%
Solar refused3 of 3612%
Onshore wind refused25 of 3445%
Battery storage refused3 of 1216%
Median time from submission to decision33.3 weeks17.0 weeks
Appeals lodged / allowed4 / 10—

Other large projects within 10 km

ProjectTypeMWStatuskm
Moorsyde Wind Farmwind farm16.1refused on appeal3.4
Corshellach Battery Energy Storagebattery storage49.9approved, not built4.1
Toft Hill Windfarmwind farm19refused on appeal7.0
Barmoor South Wind Farmwind farm13.8operational7.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.7003, -2.0421).