Moorsyde Wind Farm (16.1 MW)
Moorsyde Wind Farm is a 16.1 MW wind farm project in Northumberland, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: refused on appeal on 19 October 2008; the record was last updated on 6 December 2010.
16.1 MWwind farm
refused on appealstatus in REPD
6 December 2010record last updated
Northumberlandcouncil area
Planning timeline
| Date | Stage |
|---|---|
| 13 January 2005 | Application submitted |
| 27 March 2008 | Refused by the planning authority |
| 19 October 2008 | Appeal refused |
Project details
- Technology
- wind farm
- Capacity
- 16.1 MW
- Status (REPD)
- refused on appeal
- Record last updated
- 6 December 2010
- Operator or applicant
- Your Energy
- Planning authority
- Northumberland
- Planning application reference
- 04/B/1107
- Turbines
- 7
- Address (REPD)
- Near Chillingham, Northumberland
- Council area (by location)
- Northumberland
- Time to decision
- 167 weeks
- REPD reference
- 2588
Who decides
| Applications | Northumberland | UK |
|---|---|---|
| Decided applications (solar, wind, battery) | 82 | 10,236 |
| Refused | 31 (38%) | 19% |
| Solar refused | 3 of 36 | 12% |
| Onshore wind refused | 25 of 34 | 45% |
| Battery storage refused | 3 of 12 | 16% |
| Median time from submission to decision | 33.3 weeks | 17.0 weeks |
| Appeals lodged / allowed | 4 / 10 | — |
Other large projects within 10 km
| Project | Type | MW | Status | km |
|---|---|---|---|---|
| Ancroft Northmoor Wind Farm | wind farm | 16 | application withdrawn | 3.4 |
| Toft Hill Windfarm | wind farm | 19 | refused on appeal | 3.6 |
| Corshellach Battery Energy Storage | battery storage | 49.9 | approved, not built | 7.5 |
| Barmoor South Wind Farm | wind farm | 13.8 | operational | 8.2 |
Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (55.6984, -2.097).