Aston Road, Aston Solar Panels & Battery Energy Storage System (40 MW)

Aston Road, Aston Solar Panels & Battery Energy Storage System is a 40 MW solar farm project in West Oxfordshire, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 25 July 2025, no decision recorded; the record was last updated on 4 September 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

40 MWsolar farm
application submittedstatus in REPD
4 September 2025record last updated
West Oxfordshirecouncil area

Planning timeline

DateStage
25 July 2025Application submitted

Project details

Technology
solar farm
Capacity
40 MW
Status (REPD)
application submitted
Record last updated
4 September 2025
Operator or applicant
Ampyr Solar Europe
Planning authority
West Oxfordshire
Planning application reference
25/01702/FUL
Site area
67.9 ha
Address (REPD)
West of Aston Road, Aston
Council area (by location)
West Oxfordshire
Name in REPD
Aston Road, Aston - Solar Panels & Battery Energy Storage System
REPD reference
18920

The scheme also includes 40 MW of battery storage, recorded separately in REPD (application submitted).

Who decides

ApplicationsWest OxfordshireUK
Decided applications (solar, wind, battery)3410,236
Refused11 (32%)19%
Solar refused9 of 2612%
Battery storage refused2 of 816%
Median time from submission to decision17.0 weeks17.0 weeks
Appeals lodged / allowed3 / 1—

Other large projects within 10 km

ProjectTypeMWStatuskm
Ducklington Solar Farmsolar farm36under construction3.0
Witney Bypass, Stanton Harcourt Roadbattery storage150application submitted3.8
Caswell Lane, Brize Norton Solar Farm & Battery Storagesolar farm30application submitted4.6
Tar Solar Farmsolar farm49.9approved, not built5.5
Tar Solar Farmbattery storage40approved, not built5.5
Ventura Parkbattery storage7abandoned6.4
Quarry Solar Farm & Battery Storage Facilitysolar farm35approved, not built7.6
Quarry Solar Farm & Battery Storage Facilitybattery storage35approved, not built7.6
Eynsham Solar Farmsolar farm13.2operational8.5

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (51.7379, -1.5099).