Coal Pit Lane, Willey Solar Farm (16 MW)

Coal Pit Lane, Willey Solar Farm is a 16 MW solar farm project in Rugby, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: application submitted on 22 July 2025, no decision recorded; the record was last updated on 5 September 2025.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

16 MWsolar farm
application submittedstatus in REPD
5 September 2025record last updated
Rugbycouncil area

Planning timeline

DateStage
22 July 2025Application submitted

Project details

Technology
solar farm
Capacity
16 MW
Status (REPD)
application submitted
Record last updated
5 September 2025
Operator or applicant
Enviromena
Planning authority
Rugby
Planning application reference
R25/0623
Site area
22.9 ha
Address (REPD)
The North Of, Coal Pit Lane, Willey, Lutterworth
Council area (by location)
Rugby
Name in REPD
Coal Pit Lane, Willey - Solar Farm
REPD reference
18978

Who decides

ApplicationsRugbyUK
Decided applications (solar, wind, battery)2510,236
Refused3 (12%)19%
Solar refused1 of 1812%
Onshore wind refused2 of 245%
Battery storage refused0 of 516%
Median time from submission to decision12.6 weeks17.0 weeks
Appeals lodged / allowed1 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Streetfield Farmsolar farm18.3operational5.6
Bungalow Farm, Smeaton Lanebattery storage60application submitted6.2
Bungalow Farm, Smeaton Lanebattery storage60application submitted6.2
Lychgate Lane, Aston Flamville Solar Farmsolar farm20under construction6.2
Swift Wind Farm (Bransford Bridge)wind farm8refused on appeal6.3
Bransford Bridgewind farm18refused6.4
Harborough Fields Farmsolar farm27permission expired6.7
Swift Wind Farmwind farm8application withdrawn6.9
T Main Road, Anstybattery storage200approved, not built7.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.4724, -1.3186).