Colton Solar photovoltaic farm, Battery storage (30 MW, REPD 10944)

Colton Solar photovoltaic farm, Battery storage is a 30 MW solar farm project in South Norfolk, England. Its status in the Renewable Energy Planning Database (July 2026 extract) is: under construction since 1 June 2024; the record was last updated on 23 February 2026.

Data: REPD July 2026 extract · calculated 7 November 2026 · Methodology and sources

30 MWsolar farm
under constructionstatus in REPD
23 February 2026record last updated
South Norfolkcouncil area

Planning timeline

DateStage
7 March 2022Application submitted
30 June 2022Planning permission granted
1 June 2024Construction started

Project details

Technology
solar farm
Capacity
30 MW
Status (REPD)
under construction
Record last updated
23 February 2026
Operator or applicant
Pathfinder Clean Energy UK Dev Limited
Planning authority
South Norfolk
Planning application reference
2022/0509
Site area
53.7 ha
Address (REPD)
E/O Barnham Broom Road Colton
Council area (by location)
South Norfolk
Time to decision
16 weeks
Contracts for Difference
AR7a
Name in REPD
Colton - Solar photovoltaic farm, Battery storage
REPD reference
10944

The scheme also includes 30 MW of solar farm, recorded separately in REPD (under construction).

Who decides

ApplicationsSouth NorfolkUK
Decided applications (solar, wind, battery)5010,236
Refused8 (16%)19%
Solar refused1 of 3012%
Onshore wind refused7 of 745%
Battery storage refused0 of 1316%
Median time from submission to decision20.6 weeks17.0 weeks
Appeals lodged / allowed2 / 0—

Other large projects within 10 km

ProjectTypeMWStatuskm
Colton Solar photovoltaic farm, Battery storagebattery storage30under construction<0.1
The Old Airfieldsolar farm5operational5.1
Woodforde Farmsolar farm9operational5.6
Hardingham Solar Farmsolar farm14.8operational6.1
Hardingham Solar Farm - extensionsolar farm5.2operational6.3
Baileys Meadow Solar Farmsolar farm5refused6.4
New Road Solar Farmsolar farm5under construction7.3
Three Bridges Solar Farmsolar farm15approved, not built8.0
Hall Road, Alderfordsolar farm28refused9.1

Status and dates as recorded in the Renewable Energy Planning Database (July 2026 extract); the database is compiled from public sources and can lag behind council decisions. Location: REPD grid reference (52.6473, 1.0898).